Toronto address · Ward 7, Humber River-Black Creek
67 Haymarket Rd
The City of Toronto has 6 building permits since 2017 (2 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Multiple projects
REV: Proposed revision to garageTo construct a two-storey addition to the rear and a second addition over the existing dwelling and a detached garage in the rear yard.
Applied May 20, 2025 · issued Jun 16, 2025 · Permit 22 239991 BLD (revision 03)
- Closed
Small residential project · Multiple projects
REVISION 02: CREATING HEATED CRAWL SPACE IN ADDITION AND NEW WINDOW ON SIDE ELEVATION.To construct a two-storey addition to the rear and a second addition over the existing dwelling and a detached garage in the rear yard.
Applied Nov 22, 2023 · issued May 28, 2024 · completed Jun 11, 2024 · Permit 22 239991 BLD (revision 02)
- Closed
Heating and ventilation
HVAC - To construct a two-storey addition to the rear and a second addition over the existing dwelling and a detached garage in the rear yard.
Applied Oct 27, 2023 · issued Dec 8, 2023 · completed Jun 11, 2024 · Permit 22 239991 HVA
- Closed
Plumbing
Plumbing - To construct a two-storey addition to the rear and a second addition over the existing dwelling and a detached garage in the rear yard.
Applied Oct 20, 2023 · issued Oct 20, 2023 · completed Jun 11, 2024 · Permit 22 239991 PLB
- Closed
Small residential project · Multiple projects
Rev 01- relocate basement walkout to the side, no basement excavation required anymore.
Applied Jun 22, 2023 · issued Aug 24, 2023 · completed Jun 11, 2024 · Permit 22 239991 BLD (revision 01)
- Inspections under way
Small residential project · Multiple projects
To construct a two-storey addition to the rear and a second addition over the existing dwelling and a detached garage in the rear yard.
Applied Dec 15, 2022 · issued Mar 2, 2023 · Permit 22 239991 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a two-storey addition to the rear and a second addition over the existing dwelling and a detached garage in the rear yard.
Decision: Approved (hearing Sep 1, 2022)
Filed Jun 6, 2022 · File A0315/22EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
45 Torbarrie Rd · Minor variance
To construct a new front entrance with a canopy.
230 m away · filed Apr 23, 2026 · Approved
35 Haymarket Rd · Minor variance
To construct a second storey addition above the existing dwelling, a new covered front porch and a new garden suite in the rear yard.
250 m away · filed Jul 29, 2024 · Approved
1 Yvonne Ave · Minor variance
Proposed second storey addition to an existing single family detached dwelling.
150 m away · filed Aug 31, 2023 · Application withdrawn
6 Yvonne Ave · Minor variance
To construct a new detached dwelling with an attached garage.
100 m away · filed Jun 28, 2022 · Refused
6 Yvonne Ave · Consent
To obtain consent to sever the property into two undersized residential lots.
100 m away · filed Jun 28, 2022 · Refused
6 Yvonne Ave · Minor variance
To construct a new detached dwelling with an attached garage.
100 m away · filed Jun 28, 2022 · Refused
44 Mayall Ave · Minor variance
To construct a new detached dwelling with an attached garage.
230 m away · filed Jan 15, 2020 · Approved
28 Mayall Ave · Minor variance
To construct a new front porch and a new detached garage.
190 m away · filed Jun 12, 2019 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.