67 Langley Ave
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services
Drain - Proposal for a new entrance to the basement from the side of the existing house (basement walkout).
Applied Jul 24, 2018 · issued Jul 24, 2018 · completed Mar 24, 2025 · Permit 17 253017 DRN
- Closed
Small residential project · Walk-Out stair
REV01: Change to entrance door locationProposal for a new entrance to the basement from the side of the existing house (basement walkout).
Applied Mar 29, 2018 · issued Apr 9, 2018 · completed May 29, 2025 · Permit 17 253017 BLD (revision 01)
- Closed
Small residential project · Walk-Out stair
Proposal for a new entrance to the basement from the side of the existing house (basement walkout).
Applied Oct 25, 2017 · issued Nov 20, 2017 · completed May 29, 2025 · Permit 17 253017 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
51 homes · Residential
310 m away · Site plan · Under review · filed Apr 24, 2024
Neighbours’ Committee of Adjustment files within 250 m
13 Langley Ave · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a new rear one-storey addition, a new rear ground floor deck with stairs, and a new basement walkout stairs. The existing rear one-storey addition and deck will be demolished.
200 m away · filed Jul 20, 2026 · Hearing scheduled
47 Simpson Ave · Minor variance
To alter the rear existing one-storey ancillary building (detached garage) by constructing a complete second storey addition (containing one garden suite). There will be a total of two residential dwelling units on this lot (one unit within the main dwelling and one unit within the ancillary building).
210 m away · filed May 5, 2026 · Approved
121 Victor Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a partial rear third storey addition and a side (east) third floor roof deck (partially located on the roof of the second storey below and partially cantilevered).
140 m away · filed Apr 9, 2026 · Approved
18 Langley Ave · Minor variance
To legalize and to maintain the existing rear third storey dormer converted attic into habitable space with a rooftop patio, that were constructed beyond an authorized building permit.
180 m away · filed Mar 10, 2026 · Approved
119 Victor Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey dormer addition.
130 m away · filed Mar 2, 2026 · Approved
11 Riverdale Ave · Minor variance
To construct a new two-storey semi-detached ancillary building with a complete cantilevered second storey, and front and rear juliette balconies. This ancillary building (abutting the laneway) will contain a one car garage on the ground level and storage and loft space (no habitable space) on the second level.
190 m away · filed Aug 12, 2025 · Refused
9 Riverdale Ave · Minor variance
To construct a new two-storey semi-detached ancillary building with a partially cantilevered second storey, and a rear juliette balcony. This ancillary building (abutting the laneway) will contain a one car garage on the ground level and storage and loft space (no habitable space) on the second level.
190 m away · filed Aug 12, 2025 · Refused
52 Riverdale Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a side (west) two-storey addition, a rear second storey addition (above the existing rear one-storey addition), a third storey attic extension (for habitable space), and a rear basement walkout.
150 m away · filed Aug 11, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.