Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 13, Toronto Centre

67 Lombard St

The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Addition(s)

    REVISION -To rebuilding stairs and add sky lights at the rear of the building.To alter the existing two-storey mixed use building with commercial on the ground floor second floor by constructing a third storey residential addition and terrace.

    Applied May 20, 2014 · issued Jun 9, 2014 · Permit 13 279380 BLD (revision 01)

    Revision issued
  • Plumbing

    Plumbing - To alter the existing two-storey mixed use building with commercial on the ground floor second floor by constructing a third storey residential addition and terrace.

    Applied Apr 8, 2014 · issued Apr 28, 2014 · Permit 13 279380 PLB

    Inspections under way
  • Addition or alteration · Addition(s)

    To alter the existing two-storey mixed use building with commercial on the ground floor second floor by constructing a third storey residential addition and terrace.

    Applied Dec 18, 2013 · issued Jan 30, 2014 · Permit 13 279380 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - To alter the existing two-storey mixed use building with commercial on the ground floor second floor by constructing a third storey residential addition.

    Applied Dec 18, 2013 · issued Jan 29, 2014 · Permit 13 279380 HVA

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 89 Church St · Minor variance

    To permit a reduction in the number of required resident parking spaces and nine obstructed parking spaces, on-site.

    70 m away · filed Nov 4, 2024 · Approved

  • 90 Queen St E · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-laws 218-2021 and 219-2021), for a new 34-storey mixed-use building (which is currently under construction), by reducing the minimum number of vehicular parking spaces. There will be a total of 369 residential dwelling units on this lot.

    210 m away · filed Aug 19, 2024 · Approved

  • 88 Queen St E · Consent

    To obtain consent to a strata severance and to create various easements/rights-of-ways within a 52-storey mixed-use redevelopment currently under construction.

    190 m away · filed Jan 26, 2024 · Approved

  • 88 Queen St E · Consent

    To obtain consent to sever portions of land (a below grade strata) for the purpose of lot additions and to create various easements/rights-of-way. This application will allow for the readjustment of the lot boundaries and easements/rights-of-way (below grade) between this property and the adjacent property to the north (municipally known as 30 Mutual Street & 25 Dalhousie Street), which were originally created from one parcel and were severed under Decision Number B0015/19TEY.

    190 m away · filed Oct 16, 2023 · Approved

  • 88 Queen St E · Minor variance

    To permit the increase of residential dwelling units by constructing an additional floor above the current maximum permitted building height of the 51-storey mixed-use building, currently under construction. There will be a total of 587 dwelling units provided.

    190 m away · filed Apr 17, 2023 · Approved

  • 88 Queen St E · Minor variance

    To alter the redevelopment plan for a 52-storey mixed-use building, approved under Site Specific By-law 1293-2018 and 1294-2018.

    190 m away · filed Aug 22, 2022 · Approved

  • 67 Adelaide St E · Minor variance

    To construct a partial fourth floor addition to the existing building for the conversion into a Municipal Shelter.

    120 m away · filed May 19, 2021 · Approved

  • 20 Lombard St · Minor variance

    To alter the redevelopment plan for a 46-storey mixed-use building, previously approved under Site-Specific By-laws 132-2016 (OMB) and 133-2016 (OMB), by creating additional dwelling units, converting residential parking spaces to commercial parking spaces and converting a bicycle parking area to a bulk parcel storage room.

    210 m away · filed Sep 21, 2020 · Approved

Everything planned in Toronto Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.