Toronto address · Ward 12, Toronto-St. Paul's
68 Merton St
The City of Toronto has 10 building permits since 2017 (6 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Addition or alteration · Balcony/Guard repairs
Revision 01 - Changes to restore 150 balconies on an existing apartment building.Proposed isolated guardrail installation
Applied Aug 8, 2024 · issued Sep 9, 2024 · completed Sep 11, 2026 · Permit 22 213500 BLD (revision 01)
- Closed
Addition or alteration · Balcony/Guard repairs
Proposed isolated guardrail installation
Applied Oct 5, 2022 · issued Oct 6, 2023 · completed Sep 11, 2026 · Permit 22 213500 BLD
- Closed
Fire and security upgrade · Electromagnetic locks
Proposal to install 2 maglocks on each of the north exterior exit doors on the ground floor of an existing apartment building.
Applied Jan 24, 2017 · issued Feb 23, 2017 · completed Jul 11, 2017 · Permit 17 108143 FSU
- Revision issued
Plumbing
Revision 01- as per ST examiners noticePlumbing - To construct a 14 storey condo building containing 156 suites, underground parking which includes commercial parking spaces, a green roof, and outdoor and indoor amenity space.( One floor added)
Applied Nov 8, 2016 · issued Jan 24, 2017 · Permit 13 228385 PLB (revision 01)
- Cancelled
Fire and security upgrade · Electromagnetic locks
Proposal to install 1 electromagnetic lock on the ground floor at exit stair B.
Applied Jul 8, 2016 · completed Aug 28, 2020 · Permit 16 187239 FSU
- Inspections under way
Fire and security upgrade · Sprinklers
Proposal to install sprinklers and standpipe for new condo currently under construction
Applied Aug 12, 2015 · issued Oct 23, 2015 · Permit 15 205474 FSU
- Inspections under way
Drains and site services · Inside and outside drains
Drain - To construct a 13 storey condo building containing 148 suites, underground parking including a commercial parking garage235931.44 x 0.60 =141558.86
Applied Sep 23, 2014 · issued Oct 1, 2014 · Permit 13 228385 STS
- Inspections under way
New building
To construct a 14-storey plus mechanical penthouse apartment building containing 156 suites, underground parking including a commercial parking garage235931.44 x 0.60 =141558.86
Applied Aug 29, 2013 · issued Jul 24, 2015 · 156 homes added · Permit 13 228385 BLD
- Inspections under way
Plumbing
Plumbing - To construct a 14 storey condo building containing 156 suites, underground parking which includes commercial parking spaces, a green roof, and outdoor and indoor amenity space.( One floor added)
Applied Aug 29, 2013 · issued Sep 2, 2014 · Permit 13 228385 PLB
- Inspections under way
Heating and ventilation
HVAC - To construct a 13 storey condo building containing 148 suites, underground parking which includes commercial parking spaces, a green roof, and outdoor and indoor amenity space.
Applied Aug 29, 2013 · issued Sep 2, 2014 · Permit 13 228385 HVA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under appeal
46 storeys · 581 homes · Mixed use
70 m away · Rezoning · Under appeal · filed Aug 31, 2022
- Under review
40 storeys · 505 homes · Mixed use
70 m away · Condominium · Under review · filed Nov 3, 2021
- Under review
40 storeys · 477 homes · Residential
110 m away · Site plan · Under review · filed Nov 8, 2021
- Under review
40 storeys · 414 homes · Mixed use
180 m away · Site plan · Under review · filed Apr 19, 2022
- Approved
37 storeys · 442 homes · Mixed use
180 m away · Site plan · Approved · filed Oct 14, 2021
- Approved
Neighbours’ Committee of Adjustment files within 250 m
30 Merton St · Consent
To obtain consent to sever the property into three stratified lots (commercial parking lands, retail lands, and residential lands) and to create various easements/rights-of-ways for the approved 37-storey mixed-use building with a three level below grade parking garage (currently under construction).
90 m away · filed Jul 23, 2026 · Hearing scheduled
119 Merton St · Minor variance
To alter the existing 12-storey apartment building (Building A) by enclosing the double-height opening within Unit 417 (located on the fourth and fifth levels) for additional habitable space.
140 m away · filed Sep 17, 2025 · Approved
33 Davisville Ave · Consent
To obtain consent to sever the property into two lots, to maintain existing easements/rights-of-way as well as to create new easements/rights-of-way.
190 m away · filed May 2, 2024 · Approved
155 Balliol St · Minor variance
To permit the reduction of residential parking spaces provided within the 38-storey residential building, currently under review by Site Plan Application (File Number 21 225918 STE 12 SA). There will be a total of 442 residential dwelling units within this building.
200 m away · filed Mar 22, 2023 · Approved
119 Merton St · Minor variance
To alter the mezzanine levels within two adjacent dwelling units (units 1210 and 1216).
140 m away · filed Feb 15, 2023 · Approved
155 Balliol St · Consent
To obtain consent to sever the lot into two lots and to create new easements/rights-of-way for parking and vehicle access, as well as a dog walk area.
200 m away · filed Mar 9, 2022 · Approved
45 Balliol St · Consent
To obtain consent for a strata severance and to create easements/rights-of-way.
100 m away · filed May 9, 2021 · Approved
45 Balliol St · Minor variance
The existing residential apartment building site (Site A), located on the retained lands, being Parts 1 and 4 in Application B0059/21TEY, will not be altered but will require variance approval.
100 m away · filed May 9, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.