Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

68 Mortimer Ave

The City of Toronto has 6 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Drains and site services · Back water valve (Sewer only)

    Proposed back water valve installation.

    Applied Feb 2, 2018 · issued Feb 2, 2018 · completed Feb 5, 2018 · Permit 18 112973 DRN

    Closed
  • Small residential project · Addition(s)

    Construct 1 storey addition at front and a 1 storey addition at rear

    Applied Nov 29, 2005 · issued Nov 29, 2005 · Permit 05 206192 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - See 05 176242 for interior workConstruct 1 storey addition at front and a 1 storey addition at rear - Addition(s)

    Applied Nov 29, 2005 · issued Dec 2, 2005 · completed Jun 8, 2026 · Permit 05 206192 HVA

    Closed (dormant)
  • Plumbing

    Plumbing - Interior alteration to ground and second floors - Interior Alterations

    Applied Nov 7, 2005 · issued Nov 7, 2005 · Permit 05 176242 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Interior alteration to ground and second floors - Interior Alterations

    Applied Nov 7, 2005 · issued Nov 24, 2005 · Permit 05 176242 HVA

    Inspections under way
  • Small residential project · Interior alterations

    Interior alteration to ground and second floors

    Applied Aug 30, 2005 · issued Aug 30, 2005 · Permit 05 176242 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 120 Fulton Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey dormer addition with a rooftop deck.

    200 m away · filed Jul 29, 2026 · Hearing scheduled

  • 90 Fulton Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a front third storey dormer (the existing dormer will be demolished), a rear third storey addition, a rear three-storey addition with a rear basement walkout, and a rear ground floor deck with stairs.

    230 m away · filed Jun 24, 2025 · Approved

  • 80 Nealon Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition, and a rear ground floor covered deck with a rear basement extension below.

    110 m away · filed Aug 1, 2024 · Approved

  • 78 Westwood Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition. The existing rear one-storey addition will be demolished, and the existing shed in the rear yard will be maintained and unaltered.

    120 m away · filed Jun 17, 2024 · Approved

  • 94 Fulton Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear two-storey addition, a partial third storey addition with a rear terrace (above the second storey roof), a front second storey terrace (above the front porch), and a rear ground floor deck with stairs. The existing front porch and front second storey balcony will be reconstructed.

    210 m away · filed Apr 3, 2024 · Approved

  • 51 Nealon Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a front planter and a rear terrace.

    160 m away · filed Apr 3, 2023 · Approved

  • 92 Mortimer Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with a second storey balcony above, a rear ground floor deck, and to enclose the existing covered porch.

    70 m away · filed Mar 15, 2022 · Approved

  • 74 Westwood Ave · Minor variance

    To construct a one-storey ancillary building in the rear yard of the property.

    110 m away · filed Dec 7, 2021 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.