Toronto address · Ward 8, Eglinton-Lawrence
68 Mulholland Ave
The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Multiple projects
REV 01: Per bubble drawingsProposal for interior alterations to convert existing SFD into a Triplex.
Applied May 14, 2026 · issued Jun 25, 2026 · Permit 25 159613 BLD (revision 01)
- Inspections under way
Plumbing
Plumbing - Proposal for interior alterations to convert existing SFD into a Triplex.
Applied Jun 17, 2025 · issued Aug 8, 2025 · Permit 25 159613 PLB
- Inspections under way
Heating and ventilation
HVAC - Proposal for interior alterations to convert existing SFD into a Triplex.
Applied Jun 17, 2025 · issued Aug 8, 2025 · Permit 25 159613 HVA
- Inspections under way
Small residential project · Multiple projects
Proposal for interior alterations to convert existing SFD into a Triplex.
Applied May 14, 2025 · issued Aug 8, 2025 · 3 homes added · Permit 25 159613 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
- Under appeal
10 storeys · 555 homes · Mixed use
210 m away · Site plan · Under appeal · filed Dec 21, 2021
- Under appeal
3280 Dufferin Street and 12-16 Orfus Road
14 storeys · 340 homes · Mixed use
220 m away · Site plan · Under appeal · filed Feb 15, 2022
- Under review
28 storeys · 351 homes · Mixed use
230 m away · Site plan · Under review · filed Dec 29, 2021
- Under review
12 storeys · 194 homes · Mixed use
310 m away · Site plan · Under review · filed Sep 14, 2022
- Under review
2 storeys · Residential
320 m away · Site plan · Under review · filed Apr 27, 2023
Neighbours’ Committee of Adjustment files within 250 m
29 Mulholland Ave · Minor variance
To alter the existing detached dwelling by constructing a new front porch and basement walkout.
250 m away · filed Aug 7, 2026 · Approved
31 Celt Ave · Minor variance
To construct a new two-storey dwelling with rear covered porch. Please note a previous application (File No. A0424/25NY), with respect to the subject property, was before the Committee of Adjustment on November 20, 2025, which was approved.
240 m away · filed Dec 17, 2025 · Approved
31 Celt Ave · Minor variance
To construct a new two-storey dwelling with rear covered porch.
240 m away · filed Oct 8, 2025 · Approved
29 Mulholland Ave · Minor variance
Proposal to construct a new 2-storey signle family dwelling.
250 m away · filed Jun 3, 2022 · Approved
353 Ranee Ave · Minor variance
Proposal to expand existing rear deck and to construct a new cabana along rear property line.
250 m away · filed Jan 24, 2022 · Approved
15 Celt Ave · Minor variance
To construct a detached garage.
210 m away · filed May 2, 2021 · Approved
17 Krieger Cres · Minor variance
To alter the existing one storey detached dwelling by constructing a second storey addition and a side one-storey addition.
180 m away · filed Oct 26, 2020 · Approved
17 Creston Rd · Minor variance
To construct a new two-storey dwelling with an integral garage. The existing dwelling would be demolished.
190 m away · filed Mar 2, 2016 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.