Toronto address · Ward 24, Scarborough-Guildwood
68 Peace Dr
The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - To demolish existing dwelling and contrust a new two storey dwelling
Applied May 31, 2022 · issued Aug 16, 2022 · completed Mar 15, 2024 · Permit 22 140359 HVA
- Closed
Plumbing
Plumbing - To demolish existing dwelling and contrust a new two storey dwelling
Applied Apr 30, 2022 · issued Aug 16, 2022 · completed Mar 15, 2024 · Permit 22 140359 PLB
- Closed
New house · New building
To demolish existing dwelling and contrust a new two storey dwelling
Applied Apr 30, 2022 · issued Aug 16, 2022 · completed Oct 6, 2025 · 1 home added · Permit 22 140359 BLD
- Closed
Demolition
To demolish existing dwelling and contrust a new two storey dwelling
Applied Apr 30, 2022 · issued Aug 19, 2022 · completed Jan 10, 2023 · 1 home removed · Permit 22 140360 DEM
- Closed
Drains and site services
Drain - To demolish existing dwelling and contrust a new two storey dwelling
Applied Apr 30, 2022 · issued Aug 16, 2022 · completed Aug 26, 2025 · Permit 22 140359 DRN
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · New R building
To construct a new two-storey detached dwelling.
Decision: Approved (hearing Feb 10, 2022)
Filed Nov 8, 2021 · File A0376/21SC
What’s planned nearby
Development sites within 500 m
- Under review
2141 Ellesmere Road and 1125 Markham Road
36 storeys · Mixed use
350 m away · Site plan · Under review · filed Aug 17, 2022
- Under review
37 storeys · 438 homes · Residential
380 m away · Rezoning · Under review · filed Jul 3, 2024
- Under review
- Under review
44 storeys · 455 homes · Residential
380 m away · Site plan · Under review · filed Apr 4, 2022
Neighbours’ Committee of Adjustment files within 250 m
696 Brimorton Dr · Minor variance
To construct a front yard two-storey Garden Suite with a covered front porch. The existing dwelling will remain unaltered. This application was previously deferred at the September 10, 2025 hearing.
100 m away · filed Jun 27, 2025 · Refused
1-2 Meadowglen Pl · Minor variance
To convert unit #102 to a restaurant use.
190 m away · filed Apr 26, 2024 · Approved
8 Chancellor Dr · Minor variance
To permit an enclosed porch and carport to existing single family dwelling.See also 22 176420 WNP
230 m away · filed Jun 28, 2023 · Approved
1-2 Meadowglen Pl · Minor variance
To permit the addition of 5 dwelling units to an approved 28-storey condominium building (1-2 Meadowglen Place (Building C)), with 194 dwelling units (excluding the shared base building). NOTE: The building is currently under construction. The proposed increase in the number of dwelling units will comply with other site specific standards (for example vehicle parking, bicycle parking, amenity areas, gross floor areas and setbacks).
190 m away · filed Aug 4, 2021 · Approved
1-2 Meadowglen Pl · Consent
To create separate properties for the Phase 2 and Phase 3 condominium lands, and to create easements for access and maintenance purposes.
190 m away · filed Apr 1, 2019 · Approved
724 Brimorton Dr · Minor variance
To construct a second storey addition to an existing single family detached dwelling.
140 m away · filed Feb 20, 2019 · Approved
9 Chancellor Dr · Minor variance
To construct a new two-storey detached dwelling with an integral garage.
200 m away · filed Dec 23, 2016 · Approved
696 Brimorton Dr · Minor variance
The applicant is seeking relief from the provisions of the Zoning By-law to construct a second storey addition to the existing dwelling.
100 m away · filed Sep 28, 2016 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.