Toronto address · Ward 13, Toronto Centre
68 Winchester St
The City of Toronto has 5 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal for basement underpinning & full interior renovations including removing some load bearing walls and relocating stairs. Some exterior openings will be enlarged or relocated.
Applied Apr 22, 2022 · issued Apr 27, 2022 · completed Apr 19, 2023 · Permit 21 191382 HVA
- Closed
Small residential project · Multiple projects
REV 01- Changes as per bubbled drawings. new rear bay window addition per attached C of A decision.
Applied Jan 13, 2022 · issued Mar 11, 2022 · completed Apr 25, 2023 · Permit 21 191382 BLD (revision 01)
- Closed
Plumbing
Plumbing - Proposal for basement underpinning & full interior renovations including removing some load bearing walls and relocating stairs. Some exterior openings will be enlarged or relocated.
Applied Nov 19, 2021 · issued Nov 19, 2021 · completed Apr 19, 2023 · Permit 21 191382 PLB
- Closed
Drains and site services
Drain - Proposal for basement underpinning & full interior renovations including removing some load bearing walls and relocating stairs. Some exterior openings will be enlarged or relocated.
Applied Nov 19, 2021 · issued Nov 19, 2021 · completed May 12, 2022 · Permit 21 191382 DRN
- Closed
Small residential project · Multiple projects
Proposal for basement underpinning & full interior renovations including removing some load bearing walls and relocating stairs. Some exterior openings will be enlarged or relocated.
Applied Jul 29, 2021 · issued Aug 23, 2021 · completed Apr 25, 2023 · Permit 21 191382 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a two-storey addition to the rear of the existing semi-detached dwelling, in conjunction with other interior and exterior alterations.
Decision: Approved (hearing Oct 7, 2021)
Filed May 25, 2021 · File A0695/21TEY
What’s planned nearby
Development sites within 500 m
- Under appeal
10 storeys · 60 homes · Mixed use
150 m away · Rezoning · Under appeal · filed Mar 17, 2023
- Under review
11 storeys · Mixed use
440 m away · Site plan · Under review · filed May 26, 2026
- Under review
238-280 Wellesley Street East, 77 Howard Street and 650 Parliament Street
47 storeys · 3,182 homes · Mixed use
470 m away · Site plan · Under review · filed Apr 27, 2022
- Under review
591 Dundas Street East and 325 Gerrard Street East
26 storeys · 271 homes · Non-residential
490 m away · Site plan · Under review · filed Jan 13, 2025
Neighbours’ Committee of Adjustment files within 250 m
21 Metcalfe St · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear (east) ground floor addition and a rear third storey addition with a rear roof deck.
120 m away · filed Mar 11, 2026 · Approved
32 Salisbury Ave · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a rear third storey addition (enclosing a portion of the existing terrace).
210 m away · filed Jun 11, 2025 · Approved
20 Aberdeen Ave · Minor variance
To alter the existing three-storey townhouse dwelling by constructing a new rear one-storey addition (with basement below), a side (east) basement walkout and a rear second storey rooftop deck (above the new rear addition). The existing rear one-storey addition will be demolished.
250 m away · filed Sep 4, 2024 · Approved
603 1/2 Parliament St · Minor variance
To legalize and to maintain the existing three-storey non-residential building, which was converted from a residential building, without an authorized building permit. The existing non-residential use (law office) will be maintained.
230 m away · filed Jul 18, 2024 · Approved
17 Metcalfe St · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition above the existing rear two-storey portion of the dwelling.
120 m away · filed Apr 22, 2024 · Approved
49 Metcalfe St · Minor variance
To alter the existing three-storey semi-detached dwelling by demolishing the existing front covered porch, constructing a new covered front porch with stairs and relocating the air conditioner unit from the front of the lot (encroaching beyond the front yard lot line) to the front corner of the lot (partially encroaching beyond the front yard lot line), as approved by Minor Variance Decision A1380/22TEY. This current application is necessitated to correctly identify variances that were not included in the previous Minor Variance Decision.
50 m away · filed Dec 28, 2023 · Approved
51 Metcalfe St · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a new front porch (to replace the existing front porch).
60 m away · filed Dec 6, 2023 · Approved
294 Carlton St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear two-storey addition (with a third storey deck above), and a third storey addition.
200 m away · filed Oct 2, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.