Toronto address · Ward 14, Toronto-Danforth
680 Danforth Ave
The City of Toronto has 9 building permits since 2017 (7 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Not started
Alternative solution
Proposal for alternative solution to Escalator Egress Capacity - Pape Station.
Applied Aug 25, 2026 · Permit 26 225260 ALT
- Not started
Alternative solution
Proposal for alternative solution to building code compliance for the egress requirements in the rapid transit station - BOH Egress
Applied Aug 25, 2026 · Permit 26 225231 ALT
- Examiner's notice sent
Drains and site services · Inside and outside drains
Drain - Construction work in association with Pape Station, the PTUS Contract (North Civil Core Contract 2);Designing and boring the running tunnel, Underpinning at Pape Station, Designing and building Pape underground stations
Applied Jul 23, 2026 · Permit 23 221838 STS
- Examiner's notice sent
Plumbing
Plumbing - Construction work in association with Pape Station, the PTUS Contract (North Civil Core Contract 2);Designing and boring the running tunnel, Underpinning at Pape Station, Designing and building Pape underground stations
Applied Jul 23, 2026 · Permit 23 221838 PLB
- Examiner's notice sent
Heating and ventilation
HVAC - Construction work in association with Pape Station, the PTUS Contract (North Civil Core Contract 2);Designing and boring the running tunnel, Underpinning at Pape Station, Designing and building Pape underground stations
Applied Jul 23, 2026 · Permit 23 221838 HVA
- Inspections under way
Conditional permit · Partial permit - shoring
Conditional Permit - Part Permit - Construction work in association with Pape Station, the PTUS Contract (North Civil Core Contract 2);Designing and boring the running tunnel, Underpinning at Pape Station, Designing and building Pape underground stations
Applied Mar 1, 2024 · issued Jun 26, 2025 · Permit 23 221838 SHO
- Response received
New building
Construction work in association with Pape Station, the PTUS Contract (North Civil Core Contract 2);Designing and boring the running tunnel, Underpinning at Pape Station, Designing and building Pape underground stations
Applied Nov 3, 2023 · Permit 23 221838 BLD
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations including replace the interior stairs - Commercial Unit "A".See also 14 118153 WNP
Applied Aug 25, 2015 · issued Sep 15, 2015 · completed Feb 27, 2026 · Permit 15 212545 BLD
- Closed
Addition or alteration · Other
Proposal to construct a new handicap access ramp on city property in front of existing medical office - "New Age Medical Clinic"
Applied Oct 8, 2013 · issued Oct 10, 2013 · completed Mar 3, 2026 · Permit 13 247670 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
49 storeys · 496 homes · Mixed use
60 m away · Site plan · Under review · filed Aug 3, 2022
Neighbours’ Committee of Adjustment files within 250 m
38 Woodycrest Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition with rear ground floor deck with stairs and reconstructing front ground floor porch with stairs. Also, to construct a new one-storey detached ancillary building (two-car garage) in the rear yard, abutting the laneway.
250 m away · filed Mar 19, 2026 · Approved
43 Eaton Ave · Minor variance
To construct a new three-storey detached building (houseplex) with front and rear basement walkouts, first storey front and rear covered porches, and front and rear second storey decks. Also, to construct a new rear two-storey ancillary building (containing one laneway suite), abutting the laneway. There will be a total of five residential dwelling units on this lot (four units occupying the main building, and one unit occupying the ancillary building).
180 m away · filed Mar 12, 2026 · Deferred
111 Gough Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (with basement below), a third storey addition, a side (south) basement walkout, a rear ground floor covered deck with stairs, and front and rear third storey balconies There will be a total of two dwelling units on the lot (one secondary suite in the basement).
220 m away · filed Jul 25, 2025 · Deferred
23 Gough Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear third storey addition with a north side balcony.
200 m away · filed Apr 8, 2025 · Approved
22 Gough Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition (habitable space within the attic).
240 m away · filed Aug 7, 2024 · Approved
643 Danforth Ave · Minor variance
To alter the existing three-storey mixed-use building by constructing a rear one-storey addition (for additional ground floor commercial space) with a rear exit and landing. The existing dental office use will occupy the entire ground floor of this building as well as the adjacent building to the west (municipally known as 641 Danforth Avenue). The two existing residential dwelling units on the second and third storeys will be maintained and unaltered.
100 m away · filed Mar 26, 2024 · Approved
641 Danforth Ave · Minor variance
To alter the existing three-storey mixed-use building by constructing a rear one-storey addition (for additional ground floor commercial space) with a rear exit and landing. Also, to construct a new rear fire escape staircase on the west side of the new addition. The existing dental office use will occupy the entire ground floor of this building as well as the adjacent building to the east (municipally known as 643 Danforth Avenue). The two existing residential dwelling units on the second and third storeys will be maintained and unaltered.
110 m away · filed Mar 26, 2024 · Approved
755 Danforth Ave · Consent
To obtain consent to a long-term lease in excess of 21 years.
150 m away · filed Jan 9, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.