Toronto address · Ward 12, Toronto-St. Paul's
69 Boulton Dr
The City of Toronto has 6 building permits since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revocation pending
Drains and site services
Drain - PROPOSED BASEMENT UNDERPIN (32m), WALKOUT, DRAINS & ROUGH-IN PLUMBING.
Applied May 11, 2023 · issued May 11, 2023 · Permit 23 133418 DRN
- Revocation pending
Plumbing
Plumbing - PROPOSED BASEMENT UNDERPIN (32m), WALKOUT, DRAINS & ROUGH-IN PLUMBING.
Applied May 11, 2023 · issued May 11, 2023 · Permit 23 133418 PLB
- Permit issued
Small residential project · Multiple projects
PROPOSED BASEMENT UNDERPIN (32m), WALKOUT, DRAINS & ROUGH-IN PLUMBING.
Applied Apr 13, 2023 · issued May 4, 2023 · Permit 23 133418 BLD
- Cancelled
Plumbing
Plumbing - PROPOSED BASEMENT UNDERPIN (32m), WALKOUT, DRAINS & ROUGH-IN PLUMBING.
Applied Mar 7, 2023 · completed Apr 12, 2023 · Permit 23 120975 PLB
- Cancelled
Small residential project · Multiple projects
PROPOSED BASEMENT UNDERPIN (32m), WALKOUT, DRAINS & ROUGH-IN PLUMBING.
Applied Mar 7, 2023 · completed Apr 12, 2023 · Permit 23 120975 BLD
- Cancelled
Drains and site services
Drain - PROPOSED BASEMENT UNDERPIN (32m), WALKOUT, DRAINS & ROUGH-IN PLUMBING.
Applied Mar 7, 2023 · completed Apr 12, 2023 · Permit 23 120975 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Under review
4 homes · Residential
460 m away · Condominium · Under review · filed Feb 27, 2026
Neighbours’ Committee of Adjustment files within 250 m
58 Poplar Plains Rd · Minor variance
150 m away · filed Sep 11, 2026 · Accepted
108 Boulton Dr · Minor variance
To alter the existing two-storey detached dwelling by converting the third storey attic into habitable space. Also, to construct new third storey dormers on the north and south sides and a side (north) third storey balcony.
130 m away · filed Jun 23, 2025 · Approved
77 Poplar Plains Cres · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing front and rear third storey additions, and a rear second and third storey addition. The existing rear one-storey ancillary building (detached garage) will be maintained and unaltered.
160 m away · filed May 5, 2025 · Approved
75 Glen Edyth Dr · Minor variance
To alter the existing two-story detached dwelling (with existing rear second storey platform ) by constructing a third-storey addition with two rear (north) terraces and one side (west) third storey terrace.
210 m away · filed May 1, 2025 · Approved
71 Glen Edyth Dr · Minor variance
To alter the existing two-and-one-half storey detached dwelling by constructing a rear side (west) two-storey addition to replace the existing addition (one-storey unheated sunroom).
200 m away · filed Jan 15, 2024 · Approved
225 Cottingham St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear basement addition that will be below a ground floor deck. This deck already has an authorized building permit.
190 m away · filed Jun 9, 2023 · Approved
254 Cottingham St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a one-storey rear addition with a basement, a third floor side dormer and a new second storey deck over the one-storey addition. Also, to construct a rear ground floor patio and a basement level patio in the front yard. The existing one-storey rear addition will be demolished.
90 m away · filed May 9, 2023 · Approved
372 Davenport Rd · Minor variance
To alter the existing two-storey fourplex detached dwelling by permitting an additional basement suite (for a total of five residential units). Also, to construct a front basement walkout staircase.
200 m away · filed Dec 14, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.