The City of Toronto has 14 building permits since 2017 (7 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Designated structure · Sign building permit related

    To erect and display one illuminated ground sign, measuring 1.22 m by 0.92 m at the height of 1.83 meters on the western property line.****SMART STOP SELF STORAGE****

    Applied Apr 23, 2020 · issued May 7, 2020 · completed Mar 10, 2021 · Permit 20 136040 DST

    Closed
  • Plumbing

    Plumbing - Revision #1;. Re-routing of underground plumbing below 1st floor slab-on-groundTo construct a new four-storey building which will contain a self storage warehouse.

    Applied Oct 31, 2019 · issued Dec 5, 2019 · Permit 18 139187 PLB (revision 01)

    Revision issued
  • New building

    Revision #1: 1. Elimination of one elevator at gridlines E3 2. Removal of corridor between lockers along gridline 7 3. Re-routing of underground plumbing below 1st floor slab-on-ground.To construct a new four-storey self storage warehouse.building.

    Applied Oct 31, 2019 · issued Dec 5, 2019 · completed Jul 17, 2020 · Permit 18 139187 BLD (revision 01)

    Closed
  • Designated structure · Sign building permit related

    The applicant has proposed to erect and display two illuminated wall signs displaying static copy, one measuring 6.4 meters horizontally by 3.35 meters vertically at the height of 13.6 meters and one measuring 0.76 meters horizontally by 0.25 meters vertically at the height of 2.85 meters on the west elevation.****SMARTSTOP SELF STORAGE****

    Applied Oct 29, 2019 · issued Jan 16, 2020 · completed Jun 2, 2020 · Permit 19 241180 DST

    Closed
  • Drains and site services · Inside and outside drains

    Drain - To construct a new four-storey self storage warehouse.building.

    Applied Nov 1, 2018 · issued Dec 6, 2018 · Permit 18 139187 STS

    Inspections under way
  • Alternative solution

    This proposal is to supply and install a standpipe system utilizing the prescribed method as detailed in the national building code of canada 3.2.5.9.- 3.2.5.10 in lieu of the Ontario building Code 3.2.9.2. - 3.2.9.3.

    Applied Jun 20, 2018 · completed Jul 18, 2018 · Permit 18 181304 ALT

    Approved
  • Heating and ventilation

    HVAC - To construct a new four-storey building which will contain a self storage warehouse.

    Applied Apr 5, 2018 · issued Jul 20, 2018 · Permit 18 139187 HVA

    Inspections under way
  • New building

    To construct a new four-storey self storage warehouse.building.

    Applied Apr 5, 2018 · issued Jul 20, 2018 · completed Jul 17, 2020 · Permit 18 139187 BLD

    Closed
  • Plumbing

    Plumbing - To construct a new four-storey building which will contain a self storage warehouse.

    Applied Apr 5, 2018 · issued Jul 20, 2018 · Permit 18 139187 PLB

    Inspections under way
  • Demolition

    Proposal to demolish two storey abandoned office building structure.

    Applied Nov 27, 2017 · issued Jan 9, 2018 · Permit 17 267746 DEM

    Inspections under way
  • Conditional permit · Partial permit - foundation

    Conditional Permit - Part Permit - Addition behind the front 2 storey office of 3 storey above ground to the one storey industrial section, using a prefabricated CLT building structure. New conrete floor slab to replaced existing rear building slab. Regrading of the parking and driveways and addition of soft-landscaping, to meet new standards.

    Applied Mar 13, 2017 · completed May 9, 2018 · Permit 16 251599 FND

    Cancelled
  • Addition or alteration · Addition(s)

    Addition behind the front 2 storey office of 3 storey above ground to the one storey industrial section, using a prefabricated CLT building structure. New conrete floor slab to replaced existing rear building slab. Regrading of the parking and driveways and addition of soft-landscaping, to meet new standards.

    Applied Nov 15, 2016 · completed May 9, 2018 · Permit 16 251599 BLD

    Cancelled
Show 2 more permits
  • Drains and site services · Inside and outside drains

    Drain - Addition behind the front 2 storey office of 3 storey above ground to the one storey industrial section, using a prefabricated CLT building structure. New conrete floor slab to replaced existing rear building slab. Regrading of the parking and driveways and addition of soft-landscaping, to meet new standards.

    Applied Nov 15, 2016 · completed May 9, 2018 · Permit 16 251599 STS

    Cancelled
  • Addition or alteration · Interior demolition

    Proposal to demolish the rear industrial area roof and partition walls to the concrete slab. Cutting of slab and removal of concrete debris in order to prepare for new concrete slab and new elevator shaft.

    Applied Jul 29, 2016 · issued Oct 24, 2016 · Permit 16 198939 BLD

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To construct a new four-storey building which will contain a self storage warehouse.

    Decision: Approved (hearing Mar 22, 2018)

    Filed Feb 16, 2018 · File A0162/18EYK

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 45 Torbarrie Rd · Minor variance

    To construct a new front entrance with a canopy.

    200 m away · filed Apr 23, 2026 · Approved

  • 1 Yvonne Ave · Minor variance

    Proposed second storey addition to an existing single family detached dwelling.

    230 m away · filed Aug 31, 2023 · Application withdrawn

  • 6 Yvonne Ave · Consent

    To obtain consent to sever the property into two undersized residential lots.

    220 m away · filed Jun 28, 2022 · Refused

  • 6 Yvonne Ave · Minor variance

    To construct a new detached dwelling with an attached garage.

    220 m away · filed Jun 28, 2022 · Refused

  • 6 Yvonne Ave · Minor variance

    To construct a new detached dwelling with an attached garage.

    220 m away · filed Jun 28, 2022 · Refused

  • 150 Bartor Rd · Minor variance

    To construct a new industrial building.

    210 m away · filed Jun 12, 2018 · Approved

  • 9 Mayall Ave · Minor variance

    To construct a new detached dwelling with an integral garage.

    150 m away · filed May 3, 2018 · Deferred

  • 9 Mayall Ave · Consent

    To obtain consent to sever the property into two undersized residential lots.

    150 m away · filed May 3, 2018 · Application withdrawn

Everything planned in Humber River-Black Creek

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.