Toronto address · Ward 9, Davenport
699 Lansdowne Ave
The City of Toronto has 2 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Interior alterations to a retail store at grd fl and 3 residential units
Applied Sep 7, 2007 · issued Nov 16, 2007 · completed Jun 20, 2017 · Permit 07 259430 HVA
- Closed
Addition or alteration · Interior alterations
Interior alterations to a retail store at grd fl and bsmt and 1 residential unit (2cd and 3rd)
Applied Sep 6, 2007 · issued Nov 16, 2007 · completed Jun 20, 2017 · Permit 07 259430 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
510-514 Lansdowne Avenue and 1293-1301 Bloor Street West
28 storeys · Mixed use
160 m away · Site plan · Under review · filed Aug 9, 2022
- Under review
33 storeys · 634 homes · Mixed use
250 m away · Site plan · Under review · filed Aug 30, 2021
- Under review
21 storeys · 861 homes · Residential
280 m away · Site plan · Under review · filed Nov 7, 2024
- Approved
1167-1175 Bloor Street West, 34-42 Brock Crescent and 90 Croatia Street
14 storeys · 52 homes · Mixed use
350 m away · Rezoning · Approved · filed Feb 9, 2026
- Under review
19 storeys · 325 homes · Mixed use
430 m away · Condominium · Under review · filed Nov 8, 2021
Neighbours’ Committee of Adjustment files within 250 m
1286 Bloor St W · Minor variance
To alter the existing three-storey mixed use building by constructing a rooftop mechanical penthouse with rooftop access and a rooftop access enclosure above the third storey with a partially covered rooftop terrace and a trellis. The ground floor and partial ground floor mezzanine level will contain a commercial unit (art gallery and event space). The second storey will contain a multi-function commercial space that supports StepStones for Youth's programming and the provides amenity space for building residents (counselling rooms, a gym, a break room, and an open-concept collaboration space…
100 m away · filed Sep 2, 2026 · Postponed
57 Emerson Ave · Minor variance
To construct a new one-storey ancillary building (sitting area/workshop and sauna), with a covered porch (located at the southwest corner of the building), in the rear yard. The existing one-storey ancillary detached building (garage) will be demolished.
210 m away · filed Jun 3, 2026 · Approved
613 Lansdowne Ave · Minor variance
To convert the existing two-and-one-half-storey detached dwelling into a houseplex containing two residential dwelling units, with a new rear second storey deck with a landing and stairs and a rear basement walkout. Also, to convert the existing two-storey ancillary building (a one-car garage) in the rear yard into an art studio occupying the first and second storeys. There will be a total of two dwelling units on the lot.
240 m away · filed Apr 13, 2026 · Approved
1281 Bloor St W · Consent
To obtain consent for the technical severance of the property for the purpose of re-establishing two mixed-use lots which merged on title.
120 m away · filed Mar 4, 2026 · Approved
1319 Bloor St W · Consent
To obtain consent to sever the property into two mixed-use lots and to create new easements/rights-of-way.
240 m away · filed Sep 3, 2025 · Approved
763 Lansdowne Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a third storey addition with a rear deck, a rear one-storey addition, and a front second storey deck. Also, to construct a new two-storey ancillary building (detached garage with a workshop and storage space above) in the rear yard, abutting the laneway.
200 m away · filed Aug 26, 2025 · Approved
1319 Bloor St W · Minor variance
To permit the construction of the Bloor Lansdowne SmartTrack GO Station, which consists of the main entrance building (municipally known as 1325 Bloor Street West), and a maintenance building with bicycle parking, and a partially enclosed waste and recycling storage area (municipally known as 17 Dora Avenue). The station also includes a West Access Building as well as other station elements (including the platforms, waiting enclosures, a pedestrian tunnel to access the westerly platform, stairs and elevators) will be located within the rail corridor and not part of the subject lands (municipa…
240 m away · filed Apr 2, 2025 · Approved
1319 Bloor St W · Minor variance
To alter the development standards (as approved under Site Specific Zoning By-law 589-2022) for a 31-storey and 35-storey mixed-use building, by permitting an increase in building height and total gross floor area, and to modify the building envelope (setbacks and step-backs). There will be a total of 1,100 residential dwelling units on this lot.
240 m away · filed Aug 16, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.