Toronto address · Ward 7, Humber River-Black Creek
7-11 Arleta Ave
Arleta Manor
The City of Toronto has 8 building permits since 2017 (6 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Addition or alteration · Other
REV 01: Construct 3 new pergolas in the front yard. See MV decision A0346/25EYK.Proposal for modifications to improve accessibility around residential buildings, including new sidewalks, upgraded and new parking/driving/pedestrian areas, new drop-off parking, a new fenced garbage area, new shared garden spaces, new trees.
Applied Nov 17, 2025 · issued Dec 30, 2025 · Permit 25 159193 BLD (revision 01)
- Inspections under way
Addition or alteration · Other
Proposal for modifications to improve accessibility around residential buildings, including new sidewalks, upgraded and new parking/driving/pedestrian areas, new drop-off parking, a new fenced garbage area, new shared garden spaces, new trees.
Applied May 14, 2025 · issued Aug 21, 2025 · Permit 25 159193 BLD
- Permit issued
Addition or alteration · Interior alterations
Proposed interior alterations to common corridor in existing apartment building
Applied Aug 23, 2022 · issued Oct 27, 2022 · Permit 22 194813 BLD
- Permit issued
Addition or alteration · Interior alterations
Proposed interior alterations to common corridor in existing apartment building
Applied Aug 23, 2022 · issued Oct 27, 2022 · Permit 22 194818 BLD
- Inspections under way
Addition or alteration · Interior alterations
Construct slab on grade repairs in unit 108 at 11 Arleta Ave
Applied Jul 24, 2021 · issued Aug 24, 2021 · Permit 21 189216 BLD
- Closed
Heating and ventilation · Alter: add on /Ductwork
remove existing make up air units (total of 6) and exhaust units (total of 10), install 2 central make up air units (one per building) and ductwork on rooftops to connect to existing ductwork
Applied Sep 16, 2016 · issued Oct 21, 2016 · completed Aug 27, 2019 · Permit 16 224140 MSA
- Permit issued
Addition or alteration · Other
permit for structural roof work for new make up air units
Applied Sep 16, 2016 · issued Oct 14, 2016 · Permit 16 224140 BLD
- Closed
Heating and ventilation · Alter: Boiler/Furnace/AC replacement
Retrofit of boiler room to install natural gas fired heat pumps, exterior to the building, for domestic hot water heating. Additional boilers to be installed for space and domestic hot water heating. Installation of variable frequency drives on domestic cold water pumps.
Applied Mar 31, 2016 · issued Apr 21, 2016 · completed May 24, 2017 · Permit 16 133970 MSA
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To construct three new front canopies. One canopy will be located at 7 Arleta Avenue and two canopies will be located at 11 Arleta Avenue.
Decision: Approved (hearing Oct 23, 2025)
Filed Aug 8, 2025 · File A0346/25EYK
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
2 Thwaite Ave · Minor variance
To construct a second storey addition above the existing garage.
180 m away · filed Jan 2, 2019 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.