Toronto address · Ward 7, Humber River-Black Creek
7 Alloy Crt
The City of Toronto has 10 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposed addition to existing industrial building.
Applied Jun 5, 2024 · issued Apr 22, 2025 · completed Jun 24, 2026 · Permit 24 160148 HVA
- Inspections under way
Addition or alteration · Other
Proposed addition to existing industrial building.
Applied Jun 5, 2024 · issued Apr 22, 2025 · Permit 24 160148 BLD
- Closed
Plumbing
Plumbing - Proposed addition to existing industrial building.
Applied Jun 5, 2024 · issued Apr 22, 2025 · completed Jun 24, 2026 · Permit 24 160148 PLB
- Inspections under way
Addition or alteration · Other
The proposed plan will be to excavate a 65m^2 area and compact the soil. A concrete pad foundation will be constructed so a Tesla Megapack can be placed on it. A trench will be created to bring cables from the transformer into the building and tie into the electrical room.
Applied Nov 9, 2021 · issued Dec 8, 2021 · Permit 21 236001 BLD
- Closed
Designated structure · Sign building permit related
This property is located in the E-Employment sign district and is subject to the City of Toronto Municipal Code Chapter 694, Signs, General.The proposed signs are two illuminated wall signs displaying static copies associated with an aluminium supplier, located on a portion of the first and second storeys at the easterly elevation, measuring 4.9 m by 1.52 m and 6.92 m height and 4.9 m by 1.52 m and 9.73 m height.****HYDRO****
Applied Sep 19, 2019 · issued Oct 4, 2019 · completed Dec 30, 2019 · Permit 19 224033 DST
- Pending cancellation
Addition or alteration · Other
Proposal to roof to cover storage bins
Applied May 22, 2019 · Permit 19 157498 BLD
- Closed
Plumbing · Backflow prevention devices (Water only)
Replacement of three existing premise isolation back flow preventers due to freezing (maintenance)
Applied Aug 4, 2016 · issued Sep 23, 2016 · completed Jun 12, 2017 · Permit 16 201729 PSA
- Cancelled
Addition or alteration · Addition(s)
Permit for open air structural addition to existing Industrial Building for storage purposes.
Applied Sep 2, 2015 · completed Feb 21, 2025 · Permit 15 216954 BLD
- Inspections under way
Addition or alteration · Other
Proposal to reinforce existing concrete slab and to install a trailer tipper on top to existing industrial building
Applied Sep 20, 2013 · issued Oct 8, 2013 · Permit 13 239104 BLD
- Inspections under way
Addition or alteration · Addition(s)
One storey - rail car shelter addition to industrial building - unfinished building shell only
Applied Oct 24, 2006 · issued Nov 16, 2006 · Permit 06 186359 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
24 Arrow Rd · Minor variance
To construct a two-storey south side addition.
170 m away · filed May 6, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.