Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 5, York South-Weston

7 Bexley Cres

The City of Toronto has 5 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Multiple projects

    REVISION 2 - to include a concrete deck and cold storage beneath

    Applied Dec 1, 2015 · issued Dec 11, 2015 · completed Nov 7, 2017 · Permit 15 156821 BLD (revision 02)

    Closed
  • Small residential project · Multiple projects

    Revision 01 - Proposed revision to repair/replace existing foundation and increase deck size. TO CONSTRUCT A SECOND FLOOR ADDITION TO EXISITING 2 STOREY DETACHED HOUSE, INTERIOR ALTERATIONS, FINISHED BASEMENT AND A DETACHED GARAGE IN REAR YARD.

    Applied Sep 15, 2015 · issued Oct 1, 2015 · completed Nov 7, 2017 · Permit 15 156821 BLD (revision 01)

    Closed
  • Plumbing

    Plumbing - TO CONSTRUCT A SECOND FLOOR ADDITION TO EXISITING 2 STOREY DETACHED HOUSE, INTERIOR ALTERATIONS, FINISHED BASEMENT AND A DETACHED GARAGE IN REAR YARD.

    Applied May 22, 2015 · issued Jul 27, 2015 · completed Oct 12, 2017 · Permit 15 156821 PLB

    Closed
  • Heating and ventilation

    Hvac - to construct a second floor addition to exisiting 2 storey detached house, interior alterations, finished basement and a detached garage in rear yard.

    Applied May 14, 2015 · issued Sep 22, 2015 · completed Nov 27, 2017 · Permit 15 156821 HVA

    Closed
  • Small residential project · Multiple projects

    To construct a second floor addition to exisiting 2 storey detached house, interior alterations, finished basement and a detached garage in rear yard.

    Applied May 14, 2015 · issued Jul 27, 2015 · completed Nov 7, 2017 · Permit 15 156821 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 94 Bexley Cres · Minor variance

    To construct a new driveway and convert the garage into a cold cellar.

    230 m away · filed Nov 27, 2025 · Approved

  • 31 East Dr · Minor variance

    To construct a new semi-detached fourplex.

    220 m away · filed Mar 6, 2024 · Approved

  • 31 East Dr · Minor variance

    To construct a new semi-detached fourplex.

    220 m away · filed Mar 6, 2024 · Approved

  • 31 East Dr · Consent

    To obtain consent to sever the lot into two undersized residential lots and to construct a pair of semi-detached fourplex dwellings.

    220 m away · filed Mar 6, 2024 · Approved

  • 64 Bexley Cres · Minor variance

    To construct a new covered front porch and a new detached garage in the rear yard.

    200 m away · filed Sep 7, 2022 · Approved

  • 20 East Dr · Consent

    To obtain consent for technical severance of the property for the purpose of re-establishing two separate lots.

    170 m away · filed May 15, 2021 · Approved

  • 100 Grandville Ave · Minor variance

    To alter the existing dwelling from a multi unit residential to a two unit detached dwelling.

    150 m away · filed Mar 22, 2019 · Approved

  • 31 Pendeen Ave · Consent

    To obtain consent to sever the property into two residential lots.

    140 m away · filed Jun 18, 2018 · Approved

Everything planned in York South-Weston

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.