Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 11, University-Rosedale

7 Hart House Crcl

Hart House

The City of Toronto has 13 building permits since 2017 (11 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Other

    Proposed wholesale removal and replacement of existing conventional BUR roof with a new two-ply cold-adhered conventional modified bitumen membrane assembly, wholesale replacement of parapet metal flashing, localized masonry repairs and mortar repointing as directed by the consultant, wholesale removal and replacement of the existing deteriorated roof deck and joists

    Applied Sep 25, 2026 · Permit 26 244619 BLD

    Not started
  • Alternative solution

    Alternative Solution for 65 mm Diameter Standpipe Hose Connections Serving Basement

    Applied May 22, 2026 · completed Jul 7, 2026 · Permit 26 165610 ALT

    Approved
  • Addition or alteration · Shoring

    Revision to exterior modification to the shoring based on site condition to allow the new east underground addition for mech/elec rooms, new east rehabilitated landscape, new north alley duct bank (1,852 sm) interior reconfiguration of squash court into mech/elec spaces (1,854 sm)

    Applied Oct 3, 2025 · issued Nov 28, 2025 · Permit 25 234780 BLD

    Permit issued
  • Partial permit · Partial permit - shoring

    Part Permit - New east underground addition for mech/elec rooms, new east rehabilitated landscape, new north alley duct bank (1,852 sm) interior reconfiguration of squash court into mech/elec spaces (1,854 sm)

    Applied May 22, 2024 · issued Jan 14, 2025 · completed Feb 12, 2025 · Permit 24 146963 SHO

    Closed
  • Heating and ventilation

    HVAC - New east underground addition for mech/elec rooms, new east rehabilitated landscape, new north alley duct bank (1,852 sm) interior reconfiguration of squash court into mech/elec spaces (1,854 sm)

    Applied May 10, 2024 · issued Feb 12, 2025 · Permit 24 146963 HVA

    Permit issued
  • Addition or alteration · Addition(s)

    New east underground addition for mech/elec rooms, new east rehabilitated landscape, new north alley duct bank (1,852 sm) interior reconfiguration of squash court into mech/elec spaces (1,854 sm)

    Applied May 10, 2024 · issued Feb 12, 2025 · Permit 24 146963 BLD

    Inspections under way
  • Plumbing

    Plumbing - New east underground addition for mech/elec rooms, new east rehabilitated landscape, new north alley duct bank (1,852 sm) interior reconfiguration of squash court into mech/elec spaces (1,854 sm)

    Applied May 10, 2024 · issued Feb 12, 2025 · Permit 24 146963 PLB

    Inspections under way
  • Fire and security upgrade · Electromagnetic locks

    Proposal to relocate existing maglock in same hallway.

    Applied Sep 17, 2018 · issued Dec 14, 2018 · Permit 18 226964 FSU

    Permit issued
  • Heating and ventilation

    HVAC - Proposed interior alterations to existing washroom to provide for an accessible universal washroom

    Applied Feb 27, 2018 · issued May 16, 2018 · completed Aug 15, 2018 · Permit 18 121935 HVA

    Closed
  • Plumbing

    Plumbing - Proposed interior alterations to existing washroom to provide for an accessible universal washroom

    Applied Feb 27, 2018 · issued May 16, 2018 · Permit 18 121935 PLB

    Inspections under way
  • Addition or alteration · Interior alterations

    Proposed interior alterations to existing washroom to provide for an accessible universal washroom and relocate existing female washroom

    Applied Feb 27, 2018 · issued May 16, 2018 · Permit 18 121935 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposed interior alteraions to 3RD Floor.

    Applied Jan 23, 2018 · issued Mar 1, 2018 · Permit 18 108500 HVA

    Inspections under way
Show 1 more permit
  • Addition or alteration · Interior alterations

    Proposed interior alteraions to 3RD Floor.

    Applied Jan 23, 2018 · issued Feb 6, 2018 · Permit 18 108500 BLD

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 95 St Joseph Street

    40 storeys · 446 homes · Residential

    490 m away · Site plan · Approved · filed Apr 19, 2022

    Approved

Neighbours’ Committee of Adjustment files within 250 m

None on file since 2017.

Everything planned in University-Rosedale

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.