Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 4, Parkdale-High Park

7 Lessard Ave

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal for underpinning the entire basement of the existing single detached home

    Applied Jan 16, 2017 · issued Jan 25, 2017 · completed Aug 22, 2017 · Permit 17 104852 PLB

    Closed
  • Small residential project · Underpinning

    Proposal for underpinning the entire basement of the existing single detached home

    Applied Jan 16, 2017 · issued Jan 25, 2017 · completed Jun 9, 2017 · Permit 17 104852 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 200 Colbeck St · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear three-storey addition (including a basement), a rear ground floor covered (canopy) deck with stairs, a rear third storey rooftop deck, and two side (west) third storey dormer additions. Also, to permit and maintain an undersized rear yard parking space abutting and accessed from Jane Street.

    170 m away · filed Aug 27, 2026 · Hearing scheduled

  • 35 Methuen Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a front one-storey addition (porch enclosure).

    210 m away · filed May 30, 2025 · Approved

  • 41 Harshaw Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition with a new ground level deck. The existing rear detached garage will be maintained and unaltered.

    170 m away · filed May 21, 2024 · Approved

  • 33 Methuen Ave · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear second storey addition. The existing one-storey ancillary building (one-car garage and storage area), in the rear yard, will be maintained and unaltered.

    210 m away · filed Mar 13, 2024 · Approved

  • 58 Harshaw Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (with basement) and a rear ground floor deck. The existing ancillary building (detached garage), in the rear yard, will be maintained and unaltered.

    250 m away · filed Feb 13, 2024 · Approved

  • 93 Rivercrest Rd · Minor variance

    To alter the existing two-and-one-half-storey detached dwelling by constructing a rear third storey balcony (above the rear second storey addition approved by decision A1352/21TEY).

    190 m away · filed Jan 3, 2024 · Approved

  • 29 Methuen Ave · Minor variance

    To alter the existing three-storey detached dwelling by constructing a rear third storey rooftop deck. The existing rear third storey balcony will be demolished.

    200 m away · filed Dec 4, 2023 · Approved

  • 24 Harshaw Ave · Minor variance

    To construct a new one-storey ancillary building (semi-detached garage) in the rear yard. The existing semi-detached garage will be demolished.

    140 m away · filed Aug 1, 2023 · Application withdrawn

Everything planned in Parkdale-High Park

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.