Toronto address · Ward 22, Scarborough-Agincourt
70 Cass Ave
The City of Toronto has 1 building permit since 2017 (1 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Heating and ventilation · Other
Proposal to install a new hvac system in an existing dwelling as part of townhouse condo complex - UNIT 134
Applied Dec 1, 2021 · issued Feb 8, 2022 · Permit 21 243819 MSA
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
3421-3445 Sheppard Avenue East
14 storeys · 378 homes · Mixed use
250 m away · Condominium · Approved · filed Apr 2, 2024
- Under review
3459-3471 Sheppard Avenue East
12 storeys · 201 homes · Mixed use
300 m away · Site plan · Under review · filed Mar 31, 2023
Neighbours’ Committee of Adjustment files within 250 m
59 Aragon Ave · Consent
To obtain consent to sever the property into two residential lots. The existing one-storey detached dwelling will be demolished. Cross-reference Minor Variance Applications A0147/24SC and A0148/24SC.
200 m away · filed May 24, 2024 · Approved
59 Aragon Ave · Minor variance
To construct a new two-storey detached dwelling with a secondary suite in the basement, front porch, rear basement walkout and rear ground floor deck. Cross-reference Consent and Minor Variance Applications B0025/24SC and A0148/24SC.
200 m away · filed May 24, 2024 · Approved
59 Aragon Ave · Minor variance
To construct a new two-storey detached dwelling with a secondary suite in the basement, front porch, rear basement walkout and rear ground floor deck. Cross-reference Consent and Minor Variance Applications B0025/24SC and A0148/24SC.
200 m away · filed May 24, 2024 · Approved
42 Aragon Ave · Minor variance
To permit interior alterations to the existing residential building for two secondary suites located in the existing basement. The resulting residential building would have a maximum total of three separate residential units (one dwelling unit and two secondary suites).
190 m away · filed Jun 17, 2020 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.