Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

70 Mortimer Ave

The City of Toronto has 8 building permits since 2017 (2 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    Rev 01 - Revised HVAC Permit Application. Work is proposed in Basement Only.HVAC - Proposal for underpinning of the basement, secondary suite and modified basment walkout on the ground floor on the rear side.

    Applied Jul 30, 2024 · issued Aug 12, 2024 · completed Nov 12, 2024 · Permit 24 129446 HVA (revision 01)

    Closed
  • Heating and ventilation

    HVAC - Proposal for underpinning of the basement, secondary suite and modified basment walkout on the ground floor on the rear side.

    Applied Apr 12, 2024 · issued May 16, 2024 · completed Nov 12, 2024 · Permit 24 129446 HVA

    Closed
  • Small residential project · Multiple projects

    Proposal for underpinning of the basement, secondary suite and modified basment walkout on the ground floor on the rear side.

    Applied Mar 25, 2024 · issued Apr 8, 2024 · 1 home added · Permit 24 129446 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal for underpinning of the basement and modified basment walkout on the ground floor on the rear side.

    Applied Mar 25, 2024 · issued Apr 8, 2024 · Permit 24 129446 PLB

    Inspections under way
  • Drains and site services

    Drain - Proposal for underpinning of the basement and modified basment walkout on the ground floor on the rear side.

    Applied Mar 25, 2024 · issued Apr 8, 2024 · completed Aug 20, 2024 · Permit 24 129446 DRN

    Closed
  • Small residential project · Multiple projects

    Proposal for a secondary suite and underpinning the basement.

    Applied Mar 11, 2024 · completed Mar 13, 2024 · 1 home added · Permit 24 124161 BLD

    Cancelled
  • Drains and site services

    Drain - Proposal for a secondary suite and underpinning the basement.

    Applied Mar 11, 2024 · completed Mar 13, 2024 · Permit 24 124161 DRN

    Cancelled
  • Plumbing

    Plumbing - Proposal for underpinning the basement and changes to walk-out stairs.

    Applied Mar 11, 2024 · completed Mar 13, 2024 · Permit 24 124161 PLB

    Cancelled

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 120 Fulton Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey dormer addition with a rooftop deck.

    200 m away · filed Jul 29, 2026 · Hearing scheduled

  • 90 Fulton Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a front third storey dormer (the existing dormer will be demolished), a rear third storey addition, a rear three-storey addition with a rear basement walkout, and a rear ground floor deck with stairs.

    230 m away · filed Jun 24, 2025 · Approved

  • 80 Nealon Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a rear two-storey addition, and a rear ground floor covered deck with a rear basement extension below.

    110 m away · filed Aug 1, 2024 · Approved

  • 78 Westwood Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition. The existing rear one-storey addition will be demolished, and the existing shed in the rear yard will be maintained and unaltered.

    120 m away · filed Jun 17, 2024 · Approved

  • 94 Fulton Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear two-storey addition, a partial third storey addition with a rear terrace (above the second storey roof), a front second storey terrace (above the front porch), and a rear ground floor deck with stairs. The existing front porch and front second storey balcony will be reconstructed.

    210 m away · filed Apr 3, 2024 · Approved

  • 51 Nealon Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a front planter and a rear terrace.

    160 m away · filed Apr 3, 2023 · Approved

  • 92 Mortimer Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with a second storey balcony above, a rear ground floor deck, and to enclose the existing covered porch.

    60 m away · filed Mar 15, 2022 · Approved

  • 74 Westwood Ave · Minor variance

    To construct a one-storey ancillary building in the rear yard of the property.

    100 m away · filed Dec 7, 2021 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.