Toronto address · Ward 14, Toronto-Danforth
70 Mortimer Ave
The City of Toronto has 8 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
Rev 01 - Revised HVAC Permit Application. Work is proposed in Basement Only.HVAC - Proposal for underpinning of the basement, secondary suite and modified basment walkout on the ground floor on the rear side.
Applied Jul 30, 2024 · issued Aug 12, 2024 · completed Nov 12, 2024 · Permit 24 129446 HVA (revision 01)
- Closed
Heating and ventilation
HVAC - Proposal for underpinning of the basement, secondary suite and modified basment walkout on the ground floor on the rear side.
Applied Apr 12, 2024 · issued May 16, 2024 · completed Nov 12, 2024 · Permit 24 129446 HVA
- Inspections under way
Small residential project · Multiple projects
Proposal for underpinning of the basement, secondary suite and modified basment walkout on the ground floor on the rear side.
Applied Mar 25, 2024 · issued Apr 8, 2024 · 1 home added · Permit 24 129446 BLD
- Inspections under way
Plumbing
Plumbing - Proposal for underpinning of the basement and modified basment walkout on the ground floor on the rear side.
Applied Mar 25, 2024 · issued Apr 8, 2024 · Permit 24 129446 PLB
- Closed
Drains and site services
Drain - Proposal for underpinning of the basement and modified basment walkout on the ground floor on the rear side.
Applied Mar 25, 2024 · issued Apr 8, 2024 · completed Aug 20, 2024 · Permit 24 129446 DRN
- Cancelled
Small residential project · Multiple projects
Proposal for a secondary suite and underpinning the basement.
Applied Mar 11, 2024 · completed Mar 13, 2024 · 1 home added · Permit 24 124161 BLD
- Cancelled
Drains and site services
Drain - Proposal for a secondary suite and underpinning the basement.
Applied Mar 11, 2024 · completed Mar 13, 2024 · Permit 24 124161 DRN
- Cancelled
Plumbing
Plumbing - Proposal for underpinning the basement and changes to walk-out stairs.
Applied Mar 11, 2024 · completed Mar 13, 2024 · Permit 24 124161 PLB
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Submitted
16 storeys · 332 homes · Mixed use
260 m away · Site plan · Submitted · filed Apr 2, 2026
- Approved
995-1005 Broadview Avenue and 2-4 Mortimer Avenue
7 storeys · 50 homes · Mixed use
280 m away · Site plan · Approved · filed Dec 6, 2021
- Under review
8-40 Gowan Avenue and 5-19 Cosburn Avenue
24 storeys · 424 homes · Residential
330 m away · Site plan · Under review · filed Apr 26, 2022
- Under review
25 storeys · 299 homes · Residential
430 m away · Site plan · Under review · filed Apr 26, 2022
Neighbours’ Committee of Adjustment files within 250 m
120 Fulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey dormer addition with a rooftop deck.
200 m away · filed Jul 29, 2026 · Hearing scheduled
90 Fulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a front third storey dormer (the existing dormer will be demolished), a rear third storey addition, a rear three-storey addition with a rear basement walkout, and a rear ground floor deck with stairs.
230 m away · filed Jun 24, 2025 · Approved
80 Nealon Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition, and a rear ground floor covered deck with a rear basement extension below.
110 m away · filed Aug 1, 2024 · Approved
78 Westwood Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition. The existing rear one-storey addition will be demolished, and the existing shed in the rear yard will be maintained and unaltered.
120 m away · filed Jun 17, 2024 · Approved
94 Fulton Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear two-storey addition, a partial third storey addition with a rear terrace (above the second storey roof), a front second storey terrace (above the front porch), and a rear ground floor deck with stairs. The existing front porch and front second storey balcony will be reconstructed.
210 m away · filed Apr 3, 2024 · Approved
51 Nealon Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a front planter and a rear terrace.
160 m away · filed Apr 3, 2023 · Approved
92 Mortimer Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with a second storey balcony above, a rear ground floor deck, and to enclose the existing covered porch.
60 m away · filed Mar 15, 2022 · Approved
74 Westwood Ave · Minor variance
To construct a one-storey ancillary building in the rear yard of the property.
100 m away · filed Dec 7, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.