Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 2, Etobicoke Centre

70 Princess Anne Cres

St. Georges Junior Public School

The City of Toronto has 4 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Fire and security upgrade · Fire alarm

    Proposal for the Replacement of existing fire alarm panel with new, due to availability of spare parts for expansion. Scope also added new duct mounted smoke detectors or spot detectors for new smoke/fire dampers, also changed existing bells to new horns and/or horn/strobe devices due to compatibility with new fire alarm panel.

    Applied Nov 18, 2024 · issued Dec 10, 2024 · completed Jul 4, 2025 · Permit 24 240245 FSU

    Closed
  • Addition or alteration · Other

    Addition of 3 new hvac units and new ductwork.

    Applied Mar 10, 2022 · issued May 30, 2022 · completed Sep 2, 2025 · Permit 22 121562 BLD

    Closed
  • Heating and ventilation

    HVAC - Addition of 3 new hvac units and new ductwork.

    Applied Mar 10, 2022 · issued May 30, 2022 · completed Jan 18, 2024 · Permit 22 121562 HVA

    Closed
  • Designated structure · Solar collector

    Installation of a rooftop photovoltaic array on an existing building

    Applied Jul 29, 2016 · issued Aug 31, 2016 · completed Jan 25, 2017 · Permit 16 198793 DST

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 464 The Kingsway · Minor variance

    To construct a second storey platform at the rear of the new dwelling currently under construction, and to convert the ancillary building currently under construction in the rear yard into a garden suite.

    210 m away · filed Aug 7, 2026 · Refused

  • 462 The Kingsway · Minor variance

    To construct a new detached dwelling with an attached garage. A previous Committee of Adjustment application (A0357/23EYK) approved variances related to lot coverage, floor space index, front yard setback, side yard setback, roof eaves, location of ancillary structure and driveway width.

    230 m away · filed Mar 28, 2024 · Approved

  • 462 The Kingsway · Minor variance

    To construct a new detached dwelling with an attached garage.

    230 m away · filed Aug 24, 2023 · Approved

  • 464 The Kingsway · Minor variance

    To construct a new detached dwelling with an attached garage, a rear yard swimming pool and an ancillary structure (pool cabana) in the rear yard.

    210 m away · filed Feb 18, 2022 · Approved

  • 472 The Kingsway · Minor variance

    To construct a one-storey side and rear addition, a second storey addition above the front portion of the existing dwelling and a covered front porch.

    180 m away · filed Jun 14, 2019 · Approved

  • 28 Prince George Dr · Minor variance

    To construct a one-storey side and rear addition and a second storey addition above the east portion of the existing dwelling.

    200 m away · filed Mar 1, 2019 · Approved

  • 4 Bemersyde Dr · Minor variance

    To construct a one-storey front addition, a new covered front porch, , a one-storey rear addition and a partial second storey addition.

    220 m away · filed Sep 20, 2018 · Approved

  • 480 The Kingsway · Minor variance

    To construct a new detached dwelling with an attached garage, a rear yard deck, and a cabana in the rear yard.

    210 m away · filed Feb 10, 2017 · Approved

Everything planned in Etobicoke Centre

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.