Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

700 Queen St E

The City of Toronto has 2 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Applicant proposed interior alteration on the ground floor of the existing building

    Applied May 31, 2016 · issued Oct 11, 2016 · completed Apr 20, 2017 · Permit 16 164722 HVA

    Closed
  • Plumbing

    Plumbing - Applicant proposed interior alteration on the ground floor of the existing building

    Applied May 31, 2016 · issued Jun 27, 2016 · completed May 9, 2017 · Permit 16 164722 PLB

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 45 Baseball Pl · Minor variance

    To permit a vehicle dealership use and vehicle service use (Downtown Automatic Group Cadillac) within the existing ground floor commercial unit of the mixed-use building.

    130 m away · filed Feb 27, 2026 · Refused

  • 64 Saulter St · Minor variance

    To alter the existing two-storey row house dwelling by constructing a complete third storey addition (attic space which will be used as habitable space).

    230 m away · filed Nov 13, 2025 · Approved

  • 630 Queen St E · Consent

    To obtain consent to sever an existing retail unit located on the ground floor (within a 9-storey mixed-use building) into 4 separate ownership units. Also, to create new easements/rights-of-way and to maintain the existing easements/rights-of-way.

    220 m away · filed Oct 10, 2024 · Approved

  • 630 Queen St E · Minor variance

    To be closed. This MV file was created in error at intake (it should have been a CO file).

    220 m away · filed Sep 29, 2024 · Withdrawn

  • 79 East Don Roadway · Consent

    To obtain consent to sever the commercial/retail portion of a mixed-use development into 10 lots (one commercial parking area and 9 retail units) for ownership purposes. Also, to create easements/rights-of-way above and below-grade.

    240 m away · filed Nov 1, 2023 · Approved

  • 25 Grant St · Minor variance

    To construct a new two-storey detached rear ancillary building (containing one laneway suite), with a partially cantilevered (west) second storey, a covered (west) porch with stairs, and a side (north) second storey balcony. Also, to construct one rear parking space abutting the public lane. There will be a total of two residential dwelling units on this lot (one unit occupying the existing two-and-one-half-storey townhouse main dwelling and one unit occupying the ancillary building).

    180 m away · filed Feb 24, 2023 · Approved

  • 17 Kintyre Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a complete third floor addition and a rear exterior ground floor stair with canopy at the first floor. A portion of the existing one-storey rear addition will be demolished.

    170 m away · filed Dec 12, 2022 · Approved

  • 677 Queen St E · Minor variance

    To construct 15 additional residential dwelling units (within the Phase 2 mixed-use building), increasing the total number of permitted dwelling units (as cited in Site Specific Zoning By-laws 1363-2015 and 1364-2015) from 898 units to 913 units.

    60 m away · filed May 19, 2022 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.