Toronto address · Ward 24, Scarborough-Guildwood
705 Progress Ave
Progress Avenue Park
The City of Toronto has 45 building permits since 2017 (8 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Designated structure · Sign building permit related
1 wall sign + 1 ground sign**SCARBOROUGH PROGRESS CENTRE**
Applied Nov 18, 2025 · issued Nov 21, 2025 · completed Jan 28, 2026 · Permit 25 255312 DST
- Closed
Addition or alteration · Interior alterations
Proposed Industrial Skill training facility with interior alterations to convert Pantry area into a Universal Washroom & Janitor room, and providing a new Pantry & Lounge area in Storage area, Creating Accessible Entrance; modifications to partition walls, flooring, ceiling, paint finishes, and doors for the renovation and alteration.
Applied Feb 7, 2025 · issued Jun 5, 2025 · completed Jul 13, 2026 · Permit 25 114061 BLD
- Closed
Plumbing
Plumbing - Proposal For Converting Pantry area into a Universal Washroom & Janitor room, and providing a new Pantry & Lounge area in Storage area, Creating Accessible Entrance; modifications to partition walls, flooring, ceiling, paint finishes, and doors for the renovation and alteration.
Applied Feb 7, 2025 · issued Jun 5, 2025 · completed Jul 8, 2026 · Permit 25 114061 PLB
- Closed
Plumbing
Plumbing - Proposal For Converting a Pantry into Universal Washroom, Creating Accessible Entrance, Converting Storage into Pantry and Lounge; modifications to partition walls, flooring, ceiling, wall finishes, and doors for the renovation and alterations.
Applied Feb 7, 2025 · issued Jul 8, 2025 · completed Jul 8, 2026 · Permit 25 113999 PLB
- Closed
Heating and ventilation
HVAC - Proposal For Converting Pantry area into a Universal Washroom & Janitor room, and providing a new Pantry & Lounge area in Storage area, Creating Accessible Entrance; modifications to partition walls, flooring, ceiling, paint finishes, and doors for the renovation and alteration.
Applied Feb 7, 2025 · issued Jun 5, 2025 · completed Jul 3, 2026 · Permit 25 114061 HVA
- Closed
Heating and ventilation
HVAC - Proposal For Converting a Pantry into Universal Washroom, Creating Accessible Entrance, Converting Storage into Pantry and Lounge; modifications to partition walls, flooring, ceiling, wall finishes, and doors for the renovation and alterations.
Applied Feb 7, 2025 · issued Jul 8, 2025 · completed Jul 3, 2026 · Permit 25 113999 HVA
- Closed
Addition or alteration · Interior alterations
Proposal For Converting a Pantry into Universal Washroom, Creating Accessible Entrance, Converting Storage into Pantry and Lounge; modifications to partition walls, flooring, ceiling, wall finishes, and doors for the renovation and alterations.
Applied Feb 7, 2025 · issued Jun 5, 2025 · completed Aug 12, 2026 · Permit 25 113999 BLD
- Issuance pending
Heating and ventilation
HVAC - Proposed complete accessibility upgrades.
Applied Jul 18, 2024 · Permit 24 183498 HVA
- Examiner's notice sent
Addition or alteration · Multiple projects
Proposed complete accessibility upgrades.
Applied Jul 18, 2024 · Permit 24 183498 BLD
- Issuance pending
Plumbing
Plumbing - Proposed complete accessibility upgrades.
Applied Jul 18, 2024 · Permit 24 183498 PLB
- Revision issued
Plumbing
Revision to rough in Plumbing - Proposed interior alterations for an adult day center in unit 36 &37
Applied Jul 29, 2023 · issued Aug 14, 2023 · Permit 22 168883 PLB (revision 01)
- Permit issued
Heating and ventilation
HVAC - Proposed interior alterations for an adult day center in unit 36 &37
Applied Jun 28, 2022 · issued Nov 17, 2022 · Permit 22 168883 HVA
Show 33 more permits
- Closed
Addition or alteration · Interior alterations
Proposed interior alterations for an adult day center in unit 36 &37
Applied Jun 28, 2022 · issued Nov 17, 2022 · completed Nov 15, 2023 · Permit 22 168883 BLD
- Inspections under way
Plumbing
Plumbing - Proposed interior alterations for an adult day center in unit 36 &37
Applied Jun 28, 2022 · issued Nov 17, 2022 · Permit 22 168883 PLB
- Closed
Plumbing
Plumbing - Construct interior alteations for 5n2 Soup Kitchen (Charity)
Applied Apr 4, 2022 · issued Jun 16, 2022 · completed Feb 1, 2023 · Permit 22 130092 PLB
- Closed
Addition or alteration · Interior alterations
Construct interior alteations for 5n2 Soup Kitchen (Charity)
Applied Apr 4, 2022 · issued Jun 16, 2022 · completed Nov 22, 2022 · Permit 22 130092 BLD
- Closed
Drains and site services
Drain - Construct interior alteations for 5n2 Soup Kitchen (Charity)
Applied Apr 4, 2022 · issued Jun 16, 2022 · completed Feb 1, 2023 · Permit 22 130092 DRN
- Closed
Heating and ventilation
HVAC - Construct interior alteations for 5n2 Soup Kitchen (Charity)
Applied Apr 4, 2022 · issued Jun 16, 2022 · completed Jan 31, 2023 · Permit 22 130092 HVA
- Refusal notice
Addition or alteration · Interior alterations
Proposed addition of four (4) 9' high non-loadbearing interior partition walls. One new door will be installed in three (3) of the partitions. Purpose of application is to create two training rooms, a hallway, and two storage areas. Unit 101.
Applied Feb 8, 2022 · Permit 22 111852 BLD
- Closed
Heating and ventilation
HVAC - PROPOSED: HVAC upgrades to building
Applied Jun 9, 2021 · issued Sep 15, 2021 · completed Feb 27, 2026 · Permit 21 167878 HVA
- Closed
Addition or alteration · Interior alterations
PROPOSED: HVAC upgrades to building
Applied Jun 9, 2021 · issued Jun 17, 2021 · completed Mar 17, 2026 · Permit 21 167878 BLD
- Closed
Drains and site services · Site service
Site Servicing - interior alterations to 96 bed men's shelter Building E, Unit 47
Applied May 14, 2020 · issued Jun 4, 2020 · completed Apr 23, 2021 · Permit 19 174304 STS
- Closed
Fire and security upgrade
FS - Sprinkler Shop Drawing - interior alterations to 96 bed men's shelter Building E, Unit 47
Applied Aug 6, 2019 · completed Sep 1, 2020 · Permit 19 174304 FSU
- Closed
Addition or alteration · Multiple projects
interior alterations to 96 bed men's shelter Building E, Unit 47
Applied Jun 19, 2019 · issued Nov 1, 2019 · completed Mar 23, 2021 · Permit 19 174304 BLD
- Closed
Plumbing
Plumbing - interior alterations to 96 bed men's shelter Building E, Unit 47
Applied Jun 19, 2019 · issued Nov 18, 2019 · completed May 3, 2021 · Permit 19 174304 PLB
- Closed
Heating and ventilation
HVAC - interior alterations to 96 bed men's shelter Building E, Unit 47
Applied Jun 19, 2019 · issued Nov 21, 2019 · completed Apr 15, 2021 · Permit 19 174304 HVA
- Closed
Plumbing
Plumbing - PROPOSED FISH WHOLESALE WAREHOUSE FROM THE EXISTING UNIT( TOUFU PROCESSING FACTORY USAGE BEFORE), ADD SUSPENDED T BAR CEILING ON EXISTING OFFICE AREA.
Applied Mar 21, 2019 · issued Apr 2, 2019 · completed Jun 10, 2019 · Permit 19 105974 PLB
- Closed
Heating and ventilation
Revision 1. Adding the exaht fans and the duct pipe for the two existing washrooms.
Applied Mar 12, 2019 · issued Mar 20, 2019 · completed Jun 10, 2019 · Permit 19 105974 HVA (revision 01)
- Inspections under way
Addition or alteration · Interior alterations
Proposal for interior alterations - back to base - on ground floor of existing multiple unit building.
Applied Jan 21, 2019 · issued Feb 26, 2019 · Permit 19 106856 BLD
- Closed
Heating and ventilation
Hvac - proposed fish wholsale warehouse from the existing unit( toufu processing factory usage before), add suspended t bar ceiling on existing office area.
Applied Jan 18, 2019 · issued Feb 1, 2019 · completed Jun 10, 2019 · Permit 19 105974 HVA
- Closed
Addition or alteration · Other
Proposed fish wholesale warehouse from the existing unit( toufu processing factory usage before), add suspended t bar ceiling on existing office area.
Applied Jan 18, 2019 · issued Jan 30, 2019 · completed Apr 10, 2019 · Permit 19 105974 BLD
- Closed
Addition or alteration · Interior alterations
REV 01: Revision for floor layoutInterior alterations throughout EDUCATION AND TRAINING FACILITY for autistic children
Applied Jan 15, 2018 · issued Feb 22, 2018 · completed Jul 16, 2018 · Permit 17 218231 BLD (revision 01)
- Closed
Heating and ventilation
REV 01: Revision for floor layoutHVAC - Interior alterations throughout community centre for autistic children
Applied Jan 15, 2018 · issued Feb 21, 2018 · completed Jul 17, 2018 · Permit 17 218231 HVA (revision 01)
- Closed
Plumbing
REV 01: Revision to floor layoutPlumbing - Interior alterations throughout community centre for autistic children
Applied Jan 15, 2018 · issued Feb 21, 2018 · completed Jul 17, 2018 · Permit 17 218231 PLB (revision 01)
- Closed
Addition or alteration · Change of use
Proposal for change of use from industrial to office
Applied Oct 13, 2017 · issued Oct 13, 2017 · completed Mar 2, 2020 · Permit 17 247076 BLD
- Closed
Heating and ventilation
HVAC - Interior alterations throughout community centre for autistic children
Applied Aug 17, 2017 · issued Nov 27, 2017 · completed Jul 17, 2018 · Permit 17 218231 HVA
- Closed
Addition or alteration · Interior alterations
Interior alterations throughout EDUCATION AND TRAINING FACILITY for autistic children
Applied Aug 17, 2017 · issued Nov 27, 2017 · completed Jul 16, 2018 · Permit 17 218231 BLD
- Closed
Plumbing
Plumbing - Interior alterations throughout community centre for autistic children
Applied Aug 17, 2017 · issued Nov 27, 2017 · completed Jul 17, 2018 · Permit 17 218231 PLB
- Inspections under way
Addition or alteration · Interior alterations
Proposed food processing plant to replace existing wood manufacturing plant.
Applied Feb 14, 2017 · issued Apr 5, 2017 · Permit 17 116601 BLD
- Closed
Heating and ventilation
HVAC - Proposed food processing plant to replace existing wood manufacturing plant.
Applied Feb 14, 2017 · issued Apr 5, 2017 · completed Jun 10, 2019 · Permit 17 116601 HVA
- Closed
Plumbing
Plumbing - Proposed food processing plant to replace existing wood manufacturing plant.
Applied Feb 14, 2017 · issued Apr 5, 2017 · completed Jun 10, 2019 · Permit 17 116601 PLB
- Closed
Addition or alteration · Interior alterations
construct interior alterations for office and youth program
Applied Oct 17, 2011 · issued Mar 16, 2012 · completed Apr 28, 2022 · Permit 11 293666 BLD
- Closed
Heating and ventilation
HVAC - construct interior alterations for office and youth program
Applied Oct 17, 2011 · issued Apr 25, 2012 · completed Sep 4, 2025 · Permit 11 293666 HVA
- Closed
Addition or alteration · Interior alterations
rev-01interior alterations "yoga studio"
Applied Apr 14, 2008 · issued Apr 16, 2008 · completed Apr 28, 2022 · Permit 08 108020 BLD (revision 01)
- Closed
Addition or alteration · Interior alterations
interior alterations "yoga studio"
Applied Jan 31, 2008 · issued Feb 27, 2008 · completed Apr 28, 2022 · Permit 08 108020 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
8 homes · Residential
200 m away · Condominium · Under review · filed Nov 30, 2022
- Submitted
- Under review
- Under review
40 storeys · Residential
270 m away · Site plan · Under review · filed Dec 31, 2021
- Under review
49 storeys · 1,360 homes · Mixed use
300 m away · Rezoning · Under review · filed Dec 19, 2024
- Under review
53 storeys · 561 homes · Residential
400 m away · Site plan · Under review · filed Jun 23, 2023
Neighbours’ Committee of Adjustment files within 250 m
675 Progress Ave · Consent
Proposal to sever a 30 m2 parcel of land along the Progress Avenue frontage to be conveyed to the adjacent land shown as PART 2 on the attached plan. The parcels shown as PART 2 and PART 3 were created by severance in June, 2018 under File B0021/18SC.
210 m away · filed Dec 2, 2019 · Approved
1120 Bellamy Rd N · Minor variance
The applicant is seeking relief from the provisions of the Zoning By-law to permit manufacturing uses in units number 1 and 11 (359 square metres) and units number 2 to 10 inclusive for vehicle service and repair use (1835 square metres).
220 m away · filed Nov 19, 2018 · Approved
675 Progress Ave · Consent
This application is for consent to sever the land into two parcels, shown as PART 2 and PART 3 on the attached draft Reference Plan. A separate application for subdivision approval will create blocks for a future mixed use development, a block for a public park, and public road allowances (File 20 13 175005 ESC 38 SB).
210 m away · filed Apr 13, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.