Toronto address · Ward 17, Don Valley North
71 Brian Dr
The City of Toronto has 6 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Other
Revision 1: Panel wattage changed from 330W to 350W. Plane count changed from 18 to 17.A residential rooftop solar panel installation.
Applied Nov 2, 2017 · issued Nov 9, 2017 · completed Jun 5, 2018 · Permit 17 224211 BLD (revision 01)
- Closed
Small residential project · Other
A residential rooftop solar panel installation.
Applied Aug 28, 2017 · issued Sep 11, 2017 · completed Jun 5, 2018 · Permit 17 224211 BLD
- Closed
Drains and site services · Back water valve (Sewer only)
Back Water Valve (Sewer only)
Applied Jul 19, 2017 · issued Jul 19, 2017 · completed Jul 21, 2017 · Permit 17 201754 DRN
- Closed
Heating and ventilation
HVAC - Addition of a fourth floor to top right side of dwelling
Applied Apr 10, 2017 · issued May 9, 2017 · completed Oct 12, 2017 · Permit 17 141986 HVA
- Closed
Plumbing
Plumbing - Addition of a fourth floor to top right side of dwelling
Applied Apr 10, 2017 · issued Apr 20, 2017 · completed Oct 12, 2017 · Permit 17 141986 PLB
- Closed
Small residential project · Addition(s)
Addition of a fourth floor to top right side of dwelling
Applied Apr 10, 2017 · issued Apr 20, 2017 · completed Oct 16, 2017 · Permit 17 141986 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a second storey addition to the south portion of the existing dwelling.
Decision: Approved (hearing Feb 9, 2017)
Filed Nov 30, 2016 · File A1056/16NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
53 Brian Dr · Minor variance
To construct a second floor addition, interior alterations, and convert to a two unit dwelling.
130 m away · filed Feb 23, 2024 · Approved
7 Crossbow Cres · Minor variance
To construct a two-storey addition and second storey addition to the existing dwelling, in conjunction with other interior and exterior alterations.
160 m away · filed Jul 13, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.