Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 20, Scarborough Southwest

71 North Edgely Ave

The City of Toronto has 4 building permits since 2017 and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposed one storey rear addition addition with one secondary suite in basement.

    Applied Dec 11, 2024 · issued Dec 20, 2024 · completed Sep 9, 2025 · Permit 24 249101 HVA

    Closed
  • Plumbing

    Plumbing - Proposed one storey rear addition addition with one secondary suite in basement.

    Applied Dec 11, 2024 · issued Dec 19, 2024 · completed Sep 9, 2025 · Permit 24 249101 PLB

    Closed
  • Small residential project · Multiple projects

    Proposed one storey rear addition addition with one secondary suite in basement.

    Applied Dec 11, 2024 · issued Dec 19, 2024 · completed Sep 12, 2025 · 1 home added · Permit 24 249101 BLD

    Closed
  • Drains and site services

    Drain - Proposed one storey rear addition addition with one secondary suite in basement.

    Applied Dec 11, 2024 · issued Dec 19, 2024 · completed Jun 3, 2026 · Permit 24 249101 DRN

    Closed

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To construct a single-storey addition in the rear yard to the exisitng single-storey detached dwelling.

    Decision: Approved (hearing Jul 24, 2024)

    Filed May 19, 2024 · File A0115/24SC

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 46 North Bonnington Ave · Minor variance

    To alter the existing one-storey dwelling by constructing a new two-storey rear west yard addition, a walk out basement entrance, and platform in west rear yard.

    180 m away · filed Dec 24, 2025 · Approved

  • 545 Danforth Rd · Minor variance

    To construct a new front entrance addition (with new basement extension below) to the existing place of worship building.

    160 m away · filed Jan 13, 2025 · Approved

  • 31 North Edgely Ave · Minor variance

    To construct a new two-storey detached dwelling. Cross reference Consent and Minor Variance Applications A0283/24SC and B0053/24SC being considered jointly.

    220 m away · filed Nov 20, 2024 · Approved

  • 31 North Edgely Ave · Consent

    To obtain consent to sever the existing lot into two new residential lots. Cross reference minor variance applications A0282/24SC and A0283/24SC being considered jointly.

    220 m away · filed Nov 20, 2024 · Approved

  • 31 North Edgely Ave · Minor variance

    To construct a new two-storey detached dwelling. Cross reference Consent and Minor Variance Applications A0282/24SC and B0053/24SC being considered jointly.

    220 m away · filed Nov 20, 2024 · Approved

  • 46 North Bonnington Ave · Minor variance

    To convert the existing garage into a bachelor apartment. This item was rescheduled from the December 4, 2024 hearing.

    180 m away · filed Oct 8, 2024 · Approved

  • 24 North Woodrow Blvd · Minor variance

    To demolish existing dwelling and to construct a new two-storey detached dwelling.

    150 m away · filed Jan 25, 2023 · Approved

  • 513 Danforth Rd · Minor variance

    To construct a second storey addition to the existing dwelling.

    150 m away · filed Aug 2, 2022 · Approved

Everything planned in Scarborough Southwest

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.