Toronto address · Ward 14, Toronto-Danforth
71 Woodycrest Ave
The City of Toronto has 7 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Install back water valve
Applied Jun 18, 2026 · issued Jun 18, 2026 · completed Jun 26, 2026 · Permit 26 186826 DRN
- Closed
Small residential project · Party wall admin permits
Proposed party wall for the work being done at 73 woody crest
Applied Jul 15, 2021 · issued Aug 26, 2021 · completed May 24, 2022 · Permit 21 184916 BLD
- Closed
Heating and ventilation
HVAC - Proposal to construct a new rear one storey addition (mudroom) with an attached deck and basement walkout.
Applied Jul 8, 2019 · issued Aug 15, 2019 · completed Oct 24, 2023 · Permit 19 184725 HVA
- Closed
Plumbing
Plumbing - Proposal to construct a new rear one storey addition (mudroom) with an attached deck and basement walkout.
Applied Jul 8, 2019 · issued Aug 14, 2019 · completed Oct 24, 2023 · Permit 19 184725 PLB
- Closed
Drains and site services
Drain - Proposal to construct a new rear one storey addition (mudroom) with an attached deck and basement walkout.
Applied Jul 8, 2019 · issued Aug 14, 2019 · completed Jan 15, 2020 · Permit 19 184725 DRN
- Closed
Small residential project · Multiple projects
Proposal to construct a new rear one storey addition (mudroom) with an attached deck and basement walkout.
Applied Jul 8, 2019 · issued Aug 14, 2019 · completed Oct 24, 2023 · Permit 19 184725 BLD
- Cancelled
Small residential project · Multiple projects
Proposal to demolish mud room complete and reinstate. Foundation underpinning along back exterior foundation and add basement walkout.
Applied Oct 4, 2018 · completed May 12, 2021 · Permit 18 237874 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing 2½-storey detached dwelling by constructing a rear one-storey addition, rear basement walkout and rear ground floor deck.
Decision: Approved (hearing May 1, 2019)
Filed Feb 21, 2019 · File A0173/19TEY
What’s planned nearby
Development sites within 500 m
- Under review
49 storeys · 496 homes · Mixed use
400 m away · Site plan · Under review · filed Aug 3, 2022
- Under review
10 storeys · 57 homes · Mixed use
460 m away · Site plan · Under review · filed May 12, 2022
Neighbours’ Committee of Adjustment files within 250 m
88 Woodycrest Ave · Minor variance
To construct a new one-storey detached ancillary building (shed) in the rear yard. The existing rear one-storey detached ancillary building (shed) will be demolished.
110 m away · filed Aug 11, 2026 · Hearing scheduled
108 Eaton Ave · Minor variance
Proposal to construct a ground floor 1-storey rear addition & a ground floor rear yard deck for this existing detached SFD. Scope includes the demolition of the exist. rear addition & the exist. rear yard deck.
170 m away · filed Jun 2, 2026 · Accepted
98 Dewhurst Blvd · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear third storey addition.
150 m away · filed May 26, 2026 · Approved
96 Woodycrest Ave · Minor variance
To alter the existing three-storey detached dwelling (currently under construction from the original building permit (No. 25 250398 BLD 00 SR)) by constructing a new front porch with a canopy and stairs.
120 m away · filed May 8, 2026 · Approved
38 Woodycrest Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition with rear ground floor deck with stairs and reconstructing front ground floor porch with stairs. Also, to construct a new one-storey detached ancillary building (two-car garage) in the rear yard, abutting the laneway.
110 m away · filed Mar 19, 2026 · Approved
43 Eaton Ave · Minor variance
To construct a new three-storey detached building (houseplex) with front and rear basement walkouts, first storey front and rear covered porches, and front and rear second storey decks. Also, to construct a new rear two-storey ancillary building (containing one laneway suite), abutting the laneway. There will be a total of five residential dwelling units on this lot (four units occupying the main building, and one unit occupying the ancillary building).
180 m away · filed Mar 12, 2026 · Deferred
135 Dewhurst Blvd · Minor variance
To construct a new one-storey detached ancillary building (one-car garage), in the rear yard, abutting Somers Avenue.
240 m away · filed Oct 10, 2025 · Approved
49 Muriel Ave · Minor variance
To construct a new front yard parking pad, abutting Muriel Avenue.
200 m away · filed Oct 10, 2025 · Refused
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.