Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 14, Toronto-Danforth

714 Queen St E

The City of Toronto has 3 building permits since 2017 on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    Proposal for interior alterations for Pizza Nova restaurant

    Applied Sep 22, 2017 · issued Nov 7, 2017 · completed Aug 17, 2018 · Permit 17 237178 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations for Pizza Nova restaurant

    Applied Sep 22, 2017 · issued Nov 7, 2017 · completed Jun 25, 2025 · Permit 17 237178 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for interior alterations for Pizza Nova restaurant

    Applied Sep 22, 2017 · issued Nov 7, 2017 · completed Aug 9, 2018 · Permit 17 237178 PLB

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 45 Baseball Pl · Minor variance

    To permit a vehicle dealership use and vehicle service use (Downtown Automatic Group Cadillac) within the existing ground floor commercial unit of the mixed-use building.

    170 m away · filed Feb 27, 2026 · Refused

  • 64 Saulter St · Minor variance

    To alter the existing two-storey row house dwelling by constructing a complete third storey addition (attic space which will be used as habitable space).

    210 m away · filed Nov 13, 2025 · Approved

  • 786-788 Queen St E · Minor variance

    To construct a new six-storey mixed-use building (with stepping down of heights towards the rear lot line), containing 15 residential dwelling units, and one commercial unit (to be located on the ground level).

    220 m away · filed Dec 19, 2024 · Approved

  • 25 Grant St · Minor variance

    To construct a new two-storey detached rear ancillary building (containing one laneway suite), with a partially cantilevered (west) second storey, a covered (west) porch with stairs, and a side (north) second storey balcony. Also, to construct one rear parking space abutting the public lane. There will be a total of two residential dwelling units on this lot (one unit occupying the existing two-and-one-half-storey townhouse main dwelling and one unit occupying the ancillary building).

    140 m away · filed Feb 24, 2023 · Approved

  • 12 Boulton Ave · Minor variance

    To alter the existing two-storey dwelling by constructing a rear two-storey addition with a first storey deck.

    230 m away · filed Feb 24, 2023 · Approved

  • 17 Kintyre Ave · Minor variance

    To alter the existing two-storey detached dwelling by constructing a complete third floor addition and a rear exterior ground floor stair with canopy at the first floor. A portion of the existing one-storey rear addition will be demolished.

    170 m away · filed Dec 12, 2022 · Approved

  • 677 Queen St E · Minor variance

    To construct 15 additional residential dwelling units (within the Phase 2 mixed-use building), increasing the total number of permitted dwelling units (as cited in Site Specific Zoning By-laws 1363-2015 and 1364-2015) from 898 units to 913 units.

    100 m away · filed May 19, 2022 · Approved

  • 715 Queen St E · Consent

    To obtain consent for a technical severance for the purpose of re-establishing two lots which merged on title.

    60 m away · filed Aug 30, 2021 · Approved

Everything planned in Toronto-Danforth

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.