Toronto address · Ward 12, Toronto-St. Paul's
72 Eglinton Ave E
The City of Toronto has 14 building permits since 2017 (9 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Permit issued
Heating and ventilation
Hvac - proposed exterior entrance ramp/stair, demising wall (basement - 2nd floor), roof top mechanical screen, and demolition of bridge (3rd - 4th floor)
Applied Nov 7, 2025 · issued Dec 8, 2025 · Permit 25 127771 HVA
- Permit issued
Plumbing
Plumbing - PROPOSED EXTERIOR ENTRANCE RAMP/STAIR, DEMISING WALL (BASEMENT - 2ND FLOOR), ROOF TOP MECHANICAL SCREEN, AND DEMOLITION OF BRIDGE (3RD - 4TH FLOOR)
Applied Nov 7, 2025 · issued Dec 8, 2025 · Permit 25 127771 PLB
- Permit issued
Addition or alteration · Multiple projects
Proposed exterior entrance ramp/stair, demising wall (basement - 2nd floor), roof top mechanical screen, and demolition of bridge (3rd - 4th floor)
Applied Mar 12, 2025 · issued Jun 9, 2025 · Permit 25 127771 BLD
- Revision issued
Plumbing
REVISION - to alter the standing wastePlumbing - Proposal for interior alterations in the 4th floor of the existing building.
Applied Jul 27, 2022 · issued Aug 26, 2022 · Permit 20 230175 PLB (revision 01)
- Closed
Addition or alteration · Interior alterations
Proposal for interior alterations in the 4th floor of the existing building.
Applied Dec 17, 2020 · issued Jan 8, 2021 · completed Aug 24, 2026 · Permit 20 230175 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposal for interior alterations in the 4th floor of the existing building.
Applied Dec 17, 2020 · issued Jan 18, 2021 · Permit 20 230175 HVA
- Inspections under way
Plumbing
Plumbing - Proposal for interior alterations in the 4th floor of the existing building.
Applied Dec 17, 2020 · issued Jan 18, 2021 · Permit 20 230175 PLB
- Closed
Plumbing · Backflow prevention devices (Water only)
Proposal to install a 1 backflow prevention device
Applied Apr 13, 2019 · issued May 9, 2019 · completed Feb 14, 2020 · Permit 19 139909 PSA
- Closed
Fire and security upgrade · Electromagnetic locks
Proposal to replace the maglocks in existing office space on the 3rd floor.
Applied Aug 23, 2018 · issued Sep 17, 2018 · completed Nov 8, 2018 · Permit 18 214180 FSU
- Inspections under way
Heating and ventilation
HVAC - Proposed structual support structure on Roof for future Generator. see 07267958 for bldg permit
Applied Oct 1, 2007 · issued Oct 25, 2007 · Permit 06 180967 HVA
- Revision issued
Heating and ventilation
Revsion to delete the proposed pre-action sprinkler system in equipment room (IP Room) that was previously approved.
Applied Aug 4, 2006 · issued Sep 14, 2006 · Permit 06 122961 HVA (revision 01)
- Closed (dormant)
Plumbing
Plumbing - Make interior alterations to existing office. - Interior Alterations
Applied Apr 4, 2006 · issued Apr 11, 2006 · completed Jun 8, 2026 · Permit 06 122961 PLB
Show 2 more permits
- Closed (dormant)
Heating and ventilation
HVAC - Make interior alterations to existing office. - Interior Alterations
Applied Apr 4, 2006 · issued Apr 25, 2006 · completed Jun 8, 2026 · Permit 06 122961 HVA
- Inspections under way
Addition or alteration · Unknown
Install partitions on portion of the 3rd floor. /lm
Applied Aug 25, 1998 · issued Sep 10, 1998 · Permit 98 020689 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
59 storeys · Residential
30 m away · Site plan · Under review · filed Aug 15, 2022
- Approved
58 storeys · 1,035 homes · Mixed use
50 m away · Rezoning · Approved · filed Aug 15, 2022
- Under review
50 storeys · 624 homes · Residential
70 m away · Site plan · Under review · filed Apr 27, 2022
- Under appeal
70 storeys · 555 homes · Mixed use
110 m away · Rezoning · Under appeal · filed Apr 30, 2025
- Under review
65 storeys · 600 homes · Mixed use
160 m away · Condominium · Under review · filed Oct 15, 2021
- Under review
65 storeys · 784 homes · Mixed use
180 m away · Site plan · Under review · filed Sep 29, 2021
Neighbours’ Committee of Adjustment files within 250 m
141 Roehampton Ave · Consent
To obtain consent to sever a portion of the land for the purpose of a lot addition.
210 m away · filed Jul 21, 2025 · Approved
110 Eglinton Ave E · Minor variance
To alter the development standards approved under Site-Specific By-law 1266-2024 for the approved 61-storey two-tower mixed use development (Tower A on Block 1 and Tower B on Block 2) at the north-east corner of the lot on Block 2, by increasing the north-east podium height from one-storey (9 m) to four-storeys (18 m)) and reducing building setbacks at the north and east lot lines. There will be a total of 1,343 residential units on the lot, of which, a minimum of 4,595 m2 (approximately 72 units) will be maintained for affordable units by a social housing provider. A related Site Plan Contro…
100 m away · filed Jul 21, 2025 · Approved
39 Roehampton Ave · Consent
To obtain consent to create an easement/right-of-way in favour of the lands municipally known as 2263-2287 Yonge Street, 8-10 Eglinton Avenue East, and 25 Roehampton Avenue.
80 m away · filed May 19, 2022 · Approved
51 Eglinton Ave E · Consent
To obtain consent to create an easement/right-of-way over a portion of the 51 Eglinton Avenue East in favour of 55 Eglinton Avenue East.
60 m away · filed Jan 18, 2022 · Approved
2295 Yonge St · Minor variance
To alter the existing two-storey commercial building by converting the second-floor into recreational space.
140 m away · filed Sep 1, 2020 · Approved
2360 Yonge St · Consent
To obtain consent to create an easement/right-of-way for the purpose of pedestrian and vehicular access. Related City planning files include site plan applications (file 12 - 165842 NNY 16 SA and 19 - 196151 NNY 08 SA), and minor variance file A0473/19NY.
250 m away · filed Dec 16, 2019 · Approved
15 Roehampton Ave · Minor variance
To alter the redevelopment plan for the 36 storey mixed-use building approved under Site-Specific By-Law 1109-2013 by converting 63 residential parking spaces to commercial (24 regular sized spaces and 2 small car spaces on the P1 level and 34 regular size spaces and 3 small car spaces on the P1 Mezzanine level).
120 m away · filed Oct 17, 2019 · Approved
2360 Yonge St · Minor variance
To alter the building currently under construction by adding two additional storeys. Also proposed is the conversion of a portion of the residential and visitor parking spaces into a commercial parking garage.
250 m away · filed Jul 4, 2019 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.