Toronto address · Ward 5, York South-Weston
73 Black Creek Blvd
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
full port main line back water valve
Applied Dec 12, 2023 · issued Dec 13, 2023 · completed Dec 20, 2023 · Permit 23 235094 DRN
- Closed
Small residential project · Porch
New front yard porch with roof and cold cellar to an existing SFD.**REVSION - extend the cold cellar and maximum backfill height**.
Applied Sep 26, 2008 · issued Sep 29, 2008 · completed Mar 24, 2026 · Permit 08 161994 BLD (revision 01)
- Closed
Small residential project · Porch
New front yard porch with roof and cold cellar to an existing SFD.
Applied May 23, 2008 · issued May 27, 2008 · completed Mar 24, 2026 · Permit 08 161994 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
96 Black Creek Blvd · Minor variance
To construct a new detached dwelling with an attached garage.
150 m away · filed Sep 14, 2023 · Approved
20 Woodgate Dr · Minor variance
To construct a two-storey north side and rear addition and a rear yard deck.
190 m away · filed Apr 21, 2021 · Approved
31 Sandcliff Rd · Minor variance
To construct a two-storey rear addition and provide a secondary suite.
210 m away · filed Apr 16, 2019 · Approved
88 Clairton Cres · Minor variance
To create a secondary suite, the existing semi-detached dwelling will contain a total of two dwelling units.
240 m away · filed Nov 16, 2018 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.