Toronto address · Ward 6, York Centre
73 Clanton Park Rd
The City of Toronto has 6 building permits since 2017 (6 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Revision issued
Small residential project · Multiple projects
REV02: Revision to permit 18-189138 BLD 02 as per bubbled areas. REVISION #1: Proposal to construct a one storey side and one storey rear yard addition, interior alterations and 2 new decks
Applied Nov 23, 2019 · issued Jan 8, 2020 · Permit 18 189138 BLD (revision 03)
- Revision issued
Small residential project · Multiple projects
REVISION #1:Proposal to construct a one storey side and one storey rear yard addition, interior alterations and 2 new decks
Applied Sep 16, 2019 · issued Sep 24, 2019 · Permit 18 189138 BLD (revision 02)
- Inspections under way
Plumbing
Plumbing - Proposal to construct a one storey side and one storey rear yard addition, interior alterations and 2 new decks
Applied Aug 19, 2019 · issued Aug 19, 2019 · Permit 18 189138 PLB
- Revision issued
Heating and ventilation
HVAC Revision #1 - Proposal to construct a one storey side and one storey rear yard addition, interior alterations and 2 new decks
Applied Apr 23, 2019 · issued Jan 16, 2026 · Permit 18 189138 HVA (revision 01)
- Inspections under way
Small residential project · Multiple projects
Proposal to construct a one storey side and one storey rear yard addition, interior alterations and 2 new decks
Applied Jul 5, 2018 · issued Jul 18, 2018 · Permit 18 189138 BLD
- Inspections under way
Heating and ventilation
HVAC - Proposal to construct a one storey side and one storey rear yard addition, interior alterations and 2 new decks
Applied Jul 5, 2018 · issued Aug 31, 2018 · Permit 18 189138 HVA
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a new one storey addition and deck to the side of the existing building and to construct a new one storey addition and deck to the rear of the building.
Decision: Approved (hearing Nov 9, 2017)
Filed Sep 15, 2017 · File A0836/17NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
128 York Downs Dr · Minor variance
To alter the existing detached dwelling by constructing a second storey addition, an east side addition, a rear covered deck and a new front porch.
240 m away · filed Apr 27, 2026 · Approved
66 Palm Dr · Minor variance
To construct a second storey addition over the existing dwelling, in conjunction with other interior and exterior alterations.
120 m away · filed Mar 5, 2026 · Approved
17 Erica Ave · Minor variance
To construct a new dwelling.
130 m away · filed Dec 9, 2025 · Approved
64 Clanton Park Rd · Minor variance
Proposal to construct a new three-storey residential dwelling, and a cabana in the rear yard. (This application was previously deferred at the Committee of Adjustment hearing on November 21, 2024)
90 m away · filed Aug 15, 2024 · Approved
50 Laurelcrest Ave · Minor variance
Proposal to demolish the existing building and construct a new two storey dwelling
210 m away · filed Oct 12, 2022 · Approved
22 Erica Ave · Minor variance
Proposal to construct a second floor addition on an existing one-storey dwelling, a two-storey side addition, and a front porch extension.
130 m away · filed Aug 26, 2022 · Approved
111 Clanton Park Rd · Minor variance
Proposal to construct a 2-storey detached single family dwelling and cabana in the rear yard
200 m away · filed May 27, 2022 · Approved
72 Palm Dr · Minor variance
Proposal to construct a first floor addition, second floor addition, and rear yard covered deck.
150 m away · filed May 25, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.