Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 23, Scarborough North

73 Griffen Dr

The City of Toronto has 3 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Proposal for multiple projects (rear yard deck, basement walkout, addition and interior alterations).

    Applied Jul 30, 2025 · issued Sep 9, 2025 · Permit 25 201975 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal for multiple projects (rear yard deck, basement walkout, addition and interior alterations).

    Applied Jul 30, 2025 · issued Sep 10, 2025 · Permit 25 201975 HVA

    Inspections under way
  • Small residential project · Multiple projects

    Proposal for multiple projects (rear yard deck, basement walkout, addition and interior alterations).

    Applied Jul 29, 2025 · issued Sep 9, 2025 · Permit 25 201975 BLD

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing one-storey detached dwelling by constructing a partial side (north) two-storey addition, a full rear two-storey addition, a rear ground floor deck and a rear basement walkout. Also, to construct a new attached garage to the side (north) of the existing dwelling. The existing sunroom, carport, deck and shed will be demolished. There will be a total of two dwelling units on the lot. NOTE: This application was previously deferred at the Committee of Adjustment Hearing on April 9, 2025.

    Decision: Approved (hearing Jul 9, 2025)

    Filed Jan 15, 2025 · File A0009/25SC

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 87 Howell Sq · Minor variance

    To construct a first storey addition, a second storey addition and to extend the existing garage.

    210 m away · filed Feb 10, 2023 · Approved

  • 59 Howell Sq · Minor variance

    To construct a new carport on the east side of the existing dwelling.

    240 m away · filed Oct 26, 2018 · Approved

  • 54 Gorsey Sq · Minor variance

    To maintain the existing two-storey dwelling on 54 Gorsey Square (Part 1).

    220 m away · filed Sep 4, 2018 · Application withdrawn

  • 54 Gorsey Sq · Minor variance

    To construct a new two-storey dwelling on a new lot (Part 2) with frontage on Washburn Way.

    220 m away · filed Sep 4, 2018 · Application withdrawn

  • 54 Gorsey Sq · Consent

    To obtain consent to sever the property into two (2) undersized residential lots.

    220 m away · filed Sep 4, 2018 · Application withdrawn

Everything planned in Scarborough North

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.