Toronto address · Ward 23, Scarborough North
73 Griffen Dr
The City of Toronto has 3 building permits since 2017 (3 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Plumbing
Plumbing - Proposal for multiple projects (rear yard deck, basement walkout, addition and interior alterations).
Applied Jul 30, 2025 · issued Sep 9, 2025 · Permit 25 201975 PLB
- Inspections under way
Heating and ventilation
HVAC - Proposal for multiple projects (rear yard deck, basement walkout, addition and interior alterations).
Applied Jul 30, 2025 · issued Sep 10, 2025 · Permit 25 201975 HVA
- Inspections under way
Small residential project · Multiple projects
Proposal for multiple projects (rear yard deck, basement walkout, addition and interior alterations).
Applied Jul 29, 2025 · issued Sep 9, 2025 · Permit 25 201975 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing one-storey detached dwelling by constructing a partial side (north) two-storey addition, a full rear two-storey addition, a rear ground floor deck and a rear basement walkout. Also, to construct a new attached garage to the side (north) of the existing dwelling. The existing sunroom, carport, deck and shed will be demolished. There will be a total of two dwelling units on the lot. NOTE: This application was previously deferred at the Committee of Adjustment Hearing on April 9, 2025.
Decision: Approved (hearing Jul 9, 2025)
Filed Jan 15, 2025 · File A0009/25SC
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
87 Howell Sq · Minor variance
To construct a first storey addition, a second storey addition and to extend the existing garage.
210 m away · filed Feb 10, 2023 · Approved
59 Howell Sq · Minor variance
To construct a new carport on the east side of the existing dwelling.
240 m away · filed Oct 26, 2018 · Approved
54 Gorsey Sq · Minor variance
To maintain the existing two-storey dwelling on 54 Gorsey Square (Part 1).
220 m away · filed Sep 4, 2018 · Application withdrawn
54 Gorsey Sq · Minor variance
To construct a new two-storey dwelling on a new lot (Part 2) with frontage on Washburn Way.
220 m away · filed Sep 4, 2018 · Application withdrawn
54 Gorsey Sq · Consent
To obtain consent to sever the property into two (2) undersized residential lots.
220 m away · filed Sep 4, 2018 · Application withdrawn
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.