Toronto address · Ward 11, University-Rosedale
74 Garfield Ave
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal for Interior alterations, 2 storey rear addition, 1 storey side addition, underpinning existing SFD-D dwelling
Applied Sep 6, 2018 · issued Sep 20, 2018 · completed Dec 18, 2019 · Permit 18 139023 HVA
- Closed
Plumbing
Plumbing - Proposal for Interior alterations, 2 storey rear addition, 1 storey side addition, underpinning existing SFD-D dwelling
Applied Apr 5, 2018 · issued Apr 20, 2018 · completed Sep 5, 2019 · Permit 18 139023 PLB
- Closed
Small residential project · Multiple projects
Proposal for Interior alterations, 2 storey rear addition, 1 storey side addition, underpinning existing SFD-D dwelling
Applied Apr 5, 2018 · issued Apr 20, 2018 · completed Dec 18, 2019 · Permit 18 139023 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
181 Glenrose Ave · Minor variance
To alter the existing three-storey detached dwelling by constructing a rear third storey rooftop terrace (above the two-storey portion of the dwelling at the southeast corner).
170 m away · filed Mar 30, 2026 · Approved
225 Glenrose Ave · Consent
To obtain consent to sever the property into two residential lots.
230 m away · filed Aug 18, 2025 · Application withdrawn
225 Glenrose Ave · Minor variance
To construct a new three-storey detached dwelling with a front integral garage, a front covered porch, a rear basement terrace, a rear ground floor deck with staircase, a rear third storey balcony, and a driveway abutting Glenrose Avenue.
230 m away · filed Aug 18, 2025 · Application withdrawn
225 Glenrose Ave · Minor variance
To construct a new three-storey detached dwelling with a front integral garage, a front covered porch, a rear basement terrace, a rear ground floor deck with staircase, a rear third storey balcony, and a driveway abutting Glenrose Avenue.
230 m away · filed Aug 18, 2025 · Application withdrawn
108 Ridge Dr · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear second storey cantilevered addition (replacing the exiting roof terrace), and a rear third storey addition with a rooftop terrace.
170 m away · filed May 8, 2025 · Approved
56 Garfield Ave · Minor variance
To construct a new two-storey detached dwelling with a front integral garage, a covered front porch, a rear yard in-ground swimming pool, and a rear one-storey ancillary building (cabana).
70 m away · filed Feb 29, 2024 · Approved
82 Rosedale Heights Dr · Minor variance
To construct a new three-storey detached dwelling with an integral garage, a rear ground floor deck, and a third storey (west side) refuge balcony. The rear portion (northwest corner) of the dwelling will be one-storey in height.
100 m away · filed Oct 25, 2023 · Approved
173 Inglewood Dr · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a west side two-storey addition, third storey front and rear additions, and a front covered porch. Also, to reconstruct the rear two-storey addition, and an east side basement walkout with staircase.
190 m away · filed Aug 16, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.