Toronto address · Ward 5, York South-Weston
74 MacDonald Ave
The City of Toronto has 5 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Multiple projects
REVISIONS 01: REPLACING ONE WINDOW INTO TWO WINDOWS ON THE APPROVED SIDE DORMER ADDITION + CHANGING DORMER ROOF TO CATHEDRAL CEILINGSecond floor side dormer addition and interior alterations on the ground floor
Applied Jan 8, 2025 · issued Jan 17, 2025 · completed Apr 15, 2025 · Permit 24 175781 BLD (revision 01)
- Closed
Plumbing
Plumbing - Second floor side dormer addition and interior alterations on the ground floor
Applied Jul 9, 2024 · issued Aug 6, 2024 · completed Apr 15, 2025 · Permit 24 175781 PLB
- Closed
Heating and ventilation
HVAC - Second floor side dormer addition and interior alterations on the ground floor
Applied Jul 5, 2024 · issued Aug 6, 2024 · completed Apr 15, 2025 · Permit 24 175781 HVA
- Closed
Small residential project · Multiple projects
Second floor side dormer addition and interior alterations on the ground floor
Applied Jul 5, 2024 · issued Aug 6, 2024 · completed Apr 15, 2025 · Permit 24 175781 BLD
- Closed
Small residential project · Interior alterations
Brick knockout to enlarge existing window opening to accommodate patio door. Installation of steel lintel above enlarged window area as well as basement window for support. Installation of concrete sill on bottom of the new door opening. Removal of framing in knockout area and installation of support header.
Applied Mar 29, 2018 · issued May 2, 2018 · completed Jul 13, 2018 · Permit 18 136803 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
14 storeys · Mixed use
320 m away · Rezoning · Under review · filed Mar 11, 2026
Neighbours’ Committee of Adjustment files within 250 m
1928 Lawrence Ave W · Minor variance
To construct a second storey addition above the existing detached garage which will contain a garden suite.
170 m away · filed Jan 20, 2026 · Refused
34 Patika Ave · Minor variance
To construct a two-storey rear addition.
150 m away · filed Nov 6, 2025 · Approved
223 John St · Minor variance
To construct a new detached dwelling with an attached garage.
210 m away · filed Feb 12, 2025 · Approved
1936 Lawrence Ave W · Minor variance
To construct a three-storey apartment building. A total of 8 dwelling units are being proposed.
170 m away · filed Oct 1, 2024 · Refused
26 Vimy Ave · Minor variance
To construct a new detached dwelling with an attached garage.
170 m away · filed Jun 10, 2022 · Approved
1925 Lawrence Ave W · Consent
To obtain consent for technical severance of the property for the purpose of re-establishing two separate lots.
240 m away · filed Jan 20, 2022 · Approved
1941 Lawrence Ave W · Minor variance
To construct a new duplex dwelling.
210 m away · filed Apr 15, 2020 · Approved
53 Boyd Ave · Minor variance
To construct a two-storey rear addition.
130 m away · filed Nov 12, 2019 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.