The City of Toronto has 57 building permits since 2017 (7 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Interior alterations

    Addition of a new wall within existing Switchboard B1 Electrical Room on the second floor to accommodate new equipment layout

    Applied Aug 26, 2026 · issued Sep 1, 2026 · Permit 26 226430 BLD

    Permit issued
  • Heating and ventilation

    HVAC - Revision 1: Revision is to include addition of new walls on the 2nd floor for conduits to pass through. Proposal to construct interior alterations for 3 new Electrical rooms on the 1st floor a and new wall to accommodate equipment removal.

    Applied Jul 2, 2026 · issued Aug 19, 2026 · Permit 25 184527 HVA (revision 01)

    Revision issued
  • Addition or alteration · Interior alterations

    Revision 1: Revision is to include addition of new walls on the 2nd floor for conduits to pass through. Proposal to construct interior alterations for 3 new Electrical rooms on the 1st floor a and new wall to accommodate equipment removal.

    Applied Jul 2, 2026 · issued Aug 10, 2026 · Permit 25 184527 BLD (revision 01)

    Revision issued
  • Fire and security upgrade · Electromagnetic locks

    Proposal to Install one (1) maglock on ground floor.

    Applied Mar 12, 2026 · issued Mar 16, 2026 · Permit 26 128680 FSU

    Permit issued
  • Fire and security upgrade · Electromagnetic locks

    1st floor infrastructure Upgrades - CDC Replacement. Proposal to Install total of one (1) maglock, on1st floor. Please see the attached Dwg. # E4-02.

    Applied Feb 11, 2026 · completed Feb 17, 2026 · Permit 26 116099 FSU

    Cancelled
  • Addition or alteration · Interior alterations

    Proposal to construct interior alterations for 3 new Electrical rooms on the 1st floor a and new wall to accommodate equipment removal.

    Applied Jun 26, 2025 · issued Jul 2, 2025 · Permit 25 184527 BLD

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to construct interior alterations for 3 new Electrical rooms on the 1st floor a and new wall to accommodate equipment removal.

    Applied Jun 26, 2025 · issued Jul 4, 2025 · Permit 25 184527 HVA

    Inspections under way
  • Fire and security upgrade · Sprinklers

    Proposed replacement of existing sprinkler system on first and second-floor In data centre white tile space (total of four sprinkler zones) and installation of new nitrogen generator system.

    Applied Feb 12, 2025 · issued Feb 20, 2025 · completed Jun 15, 2026 · Permit 25 116228 FSU

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Proposal to install total of 5 maglocks on 2nd floor. See attached sheet. 4 of 6 dwg. # E4-02.Revision Drwgs; Excluded Area Hash marked

    Applied May 4, 2023 · issued Jun 1, 2023 · completed Jul 6, 2023 · Permit 22 192646 FSU (revision 01)

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Proposal to install total of 5 maglocks on 2nd floor. See attached sheet. 4 of 6 dwg. # E4-02.

    Applied Aug 18, 2022 · issued Nov 22, 2022 · completed Jul 6, 2023 · Permit 22 192646 FSU

    Closed
  • Fire and security upgrade · Sprinklers

    New sprinkler at he skylight related to permit # 20 155168

    Applied Jun 3, 2022 · issued Jun 22, 2022 · completed Nov 6, 2024 · Permit 22 156365 FSU

    Closed
  • Fire and security upgrade · Sprinklers

    Proposed installation of the protection system including pre-action sprnklers and VESDA system in the tape storage library.

    Applied Jan 24, 2022 · issued Feb 25, 2022 · completed Apr 30, 2024 · Permit 22 106794 FSU

    Closed
Show 45 more permits
  • Heating and ventilation

    HVAC - Proposal for interior alteration for an addition of CDCs, STS-PDUs, and RPPs. Construction of 3 new electrical rooms within existing 2nd floor white tile space.

    Applied Oct 12, 2021 · issued Dec 8, 2021 · completed Oct 26, 2023 · Permit 21 224500 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alteration for an addition of CDCs, STS-PDUs, and RPPs. Construction of 3 new electrical rooms within existing 2nd floor white tile space.

    Applied Oct 12, 2021 · issued Dec 8, 2021 · completed Dec 4, 2023 · Permit 21 224500 BLD

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Installation of three electromagnetic maglocks on the second floor

    Applied Nov 13, 2020 · issued Jan 6, 2021 · completed May 6, 2021 · Permit 20 217978 FSU

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations for existing office building

    Applied Oct 26, 2020 · issued Dec 3, 2020 · completed Jul 5, 2021 · Permit 20 211071 BLD

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to add a cage partition on the second floor.

    Applied Oct 8, 2020 · issued Nov 9, 2020 · completed Jul 20, 2021 · Permit 20 204264 BLD

    Closed
  • Addition or alteration · Other

    Proposal for the replacement of the existing heating boilers and associated heating system.

    Applied Sep 3, 2020 · issued Nov 3, 2020 · completed Nov 29, 2021 · Permit 20 189566 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for the replacement of the existing heating boilers and associated heating system.

    Applied Sep 3, 2020 · issued Nov 3, 2020 · completed Oct 1, 2021 · Permit 20 189566 HVA

    Closed
  • Plumbing

    Plumbing - Proposal for the replacement of the existing heating boilers and associated heating system.

    Applied Sep 3, 2020 · issued Nov 3, 2020 · completed Oct 1, 2021 · Permit 20 189566 PLB

    Closed
  • Heating and ventilation

    HVAC - Proposal to replace building envelope, reroofing, recladding and skylight replacement on ground, 2nd, 3rd and 4th of existing office building

    Applied Jul 29, 2020 · issued Aug 13, 2020 · completed May 8, 2025 · Permit 20 155168 HVA

    Closed
  • Addition or alteration · Re-Roofing/Re-Cladding

    Proposal to replace building envelope, reroofing, recladding and skylight replacement on ground, 2nd, 3rd and 4th of existing office building

    Applied Jun 11, 2020 · issued Jul 27, 2020 · completed Sep 18, 2025 · Permit 20 155168 BLD

    Closed
  • Heating and ventilation

    HVAC - Interior alterations to 3rd floor

    Applied Oct 2, 2019 · issued Nov 12, 2019 · completed Sep 14, 2020 · Permit 19 231089 HVA

    Closed
  • Addition or alteration · Interior alterations

    Interior alterations to 3rd floor

    Applied Oct 2, 2019 · issued Nov 8, 2019 · completed Sep 16, 2020 · Permit 19 231089 BLD

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Proposal to install 1 electromagnetic lock on basement.

    Applied Aug 9, 2019 · issued Oct 7, 2019 · completed Feb 28, 2020 · Permit 19 203296 FSU

    Closed
  • Addition or alteration · Interior alterations

    REV. #1 - revised slabrenovation of existing office space into electrical rooms

    Applied Jul 18, 2016 · issued Aug 24, 2016 · completed Jul 17, 2017 · Permit 16 154061 BLD (revision 01)

    Closed
  • Plumbing

    Plumbing - renovation of existing office space into electrical rooms

    Applied May 11, 2016 · issued Jun 20, 2016 · completed Jul 18, 2017 · Permit 16 154061 PLB

    Closed
  • Heating and ventilation

    HVAC - renovation of existing office space into electrical rooms

    Applied May 11, 2016 · issued Jun 20, 2016 · completed Jul 20, 2017 · Permit 16 154061 HVA

    Closed
  • Addition or alteration · Interior alterations

    renovation of existing office space into electrical rooms

    Applied May 11, 2016 · issued Jun 20, 2016 · completed Jul 17, 2017 · Permit 16 154061 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for an interior demolition to the basement plan to prepare for new electrical rooms (under separate permit application)

    Applied Feb 19, 2016 · issued Mar 17, 2016 · completed Jul 18, 2017 · Permit 16 118601 HVA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for interior alterations to construct new openings within existing server room (G-02), and to construct a new electrical room for the installation of new electrical and mechanical support equipment for the existing data centre

    Applied Feb 16, 2016 · issued Apr 5, 2016 · completed Aug 11, 2017 · Permit 16 116862 BLD

    Closed
  • Heating and ventilation

    HVAC - Proposal for interior alterations to construct new openings within existing server room (G-02), and to construct a new electrical room for the installation of new electrical and mechanical support equipment for the existing data centre

    Applied Feb 16, 2016 · issued Apr 25, 2016 · completed Aug 10, 2017 · Permit 16 116862 HVA

    Closed
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - interior alterations of office suite to accomodate new data centre

    Applied Jun 28, 2011 · Permit 11 203346 FSU

    Application on hold
  • Addition or alteration · Re-Roofing/Re-Cladding

    non-structural re-roofing

    Applied Apr 14, 2011 · issued Oct 19, 2011 · completed Oct 18, 2018 · Permit 11 174781 BLD

    Closed
  • Addition or alteration · Interior alterations

    interior alterations to 3rd floor

    Applied Oct 12, 2010 · issued Nov 9, 2010 · completed Aug 29, 2018 · Permit 10 275429 BLD

    Closed
  • Addition or alteration · Shoring

    Rev #1 - Temporary exterior shoring for installation of three diesel tanks and seven water storage tanks using the shotcrete method of shoring (Previous method Caissons)Shoring permit for installation of underground fuel tanks and water storage units (emergency power supply)

    Applied May 29, 2009 · issued Jun 12, 2009 · completed Mar 21, 2019 · Permit 09 119877 BLD (revision 01)

    Closed
  • Plumbing

    Plumbing - interior alterations 3 rd & 4th floors

    Applied May 27, 2009 · issued Jun 19, 2009 · completed Mar 15, 2019 · Permit 09 142085 PLB

    Closed
  • Addition or alteration · Interior alterations

    interior alterations 3 rd & 4th floors

    Applied May 27, 2009 · issued Jun 19, 2009 · completed Aug 29, 2018 · Permit 09 142085 BLD

    Closed
  • Heating and ventilation

    HVAC - interior alterations 3 rd & 4th floors

    Applied May 27, 2009 · issued Jun 19, 2009 · completed Jun 28, 2019 · Permit 09 142085 HVA

    Closed
  • Drains and site services · Inside and outside drains

    Drain - addition of diesel penthouse, new shillers & cooling tower

    Applied Apr 8, 2009 · issued May 14, 2009 · completed Mar 15, 2019 · Permit 08 196406 STS

    Closed
  • Addition or alteration · Shoring

    Shoring permit for installation of underground fuel tanks and water storage units (emergency power supply)

    Applied Mar 25, 2009 · issued May 7, 2009 · completed Mar 21, 2019 · Permit 09 119877 BLD

    Closed
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - addition of diesel penthouse, new shillers & cooling tower

    Applied Mar 19, 2009 · completed Jul 18, 2018 · Permit 08 196406 FSU

    Cancelled
  • Heating and ventilation

    HVAC - Interior office expansion and renovation.

    Applied Mar 10, 2009 · issued Apr 8, 2009 · completed Jun 28, 2019 · Permit 09 115357 HVA

    Closed
  • Plumbing

    Plumbing - Interior office expansion and renovation.

    Applied Mar 10, 2009 · issued Apr 6, 2009 · completed Mar 15, 2019 · Permit 09 115357 PLB

    Closed
  • Fire and security upgrade · Electromagnetic locks

    1 Electromagnetic lock - move existing location.

    Applied Mar 9, 2009 · issued Oct 6, 2009 · completed Aug 30, 2019 · Permit 09 115370 FSU

    Cancelled
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - phase 1 upgrade, interalterations to basement, 3rd &4th floor

    Applied Nov 21, 2008 · completed Jul 18, 2018 · Permit 08 181289 FSU

    Cancelled
  • Plumbing

    Plumbing - addition of diesel penthouse, new shillers & cooling tower

    Applied Aug 25, 2008 · issued Apr 16, 2009 · completed Mar 15, 2019 · Permit 08 196406 PLB

    Closed
  • Plumbing

    Plumbing - phase 1 upgrade, interalterations to basement, 3rd &4th floor

    Applied Aug 22, 2008 · issued Feb 10, 2009 · completed Mar 15, 2019 · Permit 08 181289 PLB

    Closed
  • Heating and ventilation

    HVAC - addition of diesel penthouse, new shillers & cooling tower

    Applied Aug 22, 2008 · issued May 25, 2009 · completed Jul 17, 2018 · Permit 08 196406 HVA

    Closed
  • Designated structure · Exterior tank & support

    construct pad for exterior cooling tower

    Applied Aug 14, 2008 · issued Oct 16, 2008 · completed May 7, 2019 · Permit 08 193808 DST

    Closed
  • Addition or alteration · Interior alterations

    phase 1 upgrade, interalterations to basement, 3rd &4th floor

    Applied Jul 14, 2008 · issued Feb 10, 2009 · completed Jul 6, 2018 · Permit 08 181289 BLD

    Closed
  • Fire and security upgrade · Fire alarm

    removal of existing fire alarm system, and complete installation of new fire alarm syste with all detection, sprinkler modification

    Applied Nov 14, 2007 · issued Dec 11, 2007 · completed Jul 24, 2019 · Permit 07 278737 FSU

    Cancelled
  • Addition or alteration · Interior alterations

    minor interior alterations to first and third floor

    Applied Jul 10, 2007 · issued Aug 8, 2007 · completed Aug 29, 2018 · Permit 07 241449 BLD

    Closed
  • Plumbing · Other

    Addition of three air handling units and two airconditioning units

    Applied Mar 31, 2006 · issued Apr 18, 2006 · completed Mar 15, 2019 · Permit 06 118937 PSA

    Closed
  • Heating and ventilation · Other

    Addition of three air handling units and two airconditioning units

    Applied Mar 21, 2006 · issued Apr 18, 2006 · completed Feb 19, 2019 · Permit 06 118937 MSA

    Closed
  • Heating and ventilation

    HVAC - interior alterations to basement and 4th floor for TD Canada Trust - Interior Alterations

    Applied Oct 5, 2005 · issued May 10, 2007 · completed Feb 19, 2019 · Permit 05 190792 HVA

    Closed
  • Addition or alteration · Interior alterations

    interior alterations to basement and 4th floor for TD Canada Trust

    Applied Oct 5, 2005 · issued May 10, 2007 · completed Aug 29, 2018 · Permit 05 190792 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

  • 710 Progress Avenue

    Not stated in the file

    280 m away · Rezoning · Submitted · filed Mar 4, 2025

    Submitted
  • 710 Progress Avenue

    46 storeys · Mixed use

    280 m away · Rezoning · Under review · filed Jun 17, 2024

    Under review
  • 670-690 Progress Avenue

    40 storeys · Residential

    460 m away · Site plan · Under review · filed Dec 31, 2021

    Under review
  • 1120 Bellamy Road North

    8 homes · Residential

    460 m away · Condominium · Under review · filed Nov 30, 2022

    Under review

Neighbours’ Committee of Adjustment files within 250 m

  • 801 Progress Ave · Minor variance

    Interior alterations to the north wing to convert the existing church space into a day nursery.

    190 m away · filed Aug 1, 2025 · Approved

  • 1160 Bellamy Rd N · Minor variance

    To permit a floor area of approximately 240 m2 in the existing warehouse and office building to be used for educational and training purposes.

    210 m away · filed Sep 6, 2017 · Application withdrawn

Everything planned in Scarborough-Guildwood

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.