Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 16, Don Valley East

75 Barber Greene Rd

The City of Toronto has 11 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Plumbing

    Plumbing - Interior alteration to existing group d occupacy for Canadian Tire

    Applied Jul 14, 2026 · issued Jul 16, 2026 · Permit 26 201604 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Interior alteration to existing group d occupacy for Canadian Tire

    Applied Jul 14, 2026 · issued Jul 15, 2026 · Permit 26 201604 HVA

    Permit issued
  • Addition or alteration · Interior alterations

    Interior alteration to existing group d occupacy for Canadian Tire

    Applied Jul 14, 2026 · issued Jul 15, 2026 · Permit 26 201604 BLD

    Permit issued
  • Addition or alteration · Interior alterations

    Proposed interior alterations to existing office space to add sprinklers and strobes for phone booths in open office areas.

    Applied Oct 24, 2023 · issued Oct 30, 2023 · completed Mar 12, 2024 · Permit 23 218094 BLD

    Closed
  • Fire and security upgrade · Electromagnetic locks

    Proposal to install one electromagnetic lock.

    Applied Nov 20, 2019 · issued Dec 23, 2019 · Permit 19 251449 FSU

    Inspections under way
  • Addition or alteration · Interior alterations

    Rev 01: Proposed revision to storage area as per bubbled drawingsInterior alterations of the existing business office area that pre-exist whitin a portion of a group F-2 warehouse facility which also has other group D business office areas eleswhere whith in it. Canadian Tire

    Applied Jul 25, 2019 · issued Aug 15, 2019 · completed Nov 29, 2019 · Permit 18 183314 BLD (revision 01)

    Closed
  • Heating and ventilation

    Rev 01: Proposed revision to storage area as per bubbled drawingsHVAC - Interior alterations of the existing business office area that pre-exist whitin a portion of a group F-2 warehouse facility which also has other group D business office areas eleswhere whith in it.

    Applied Jul 25, 2019 · issued Aug 14, 2019 · completed Dec 13, 2019 · Permit 18 183314 HVA (revision 01)

    Closed
  • Designated structure · Sign building permit related

    To erect and display one wall sign and one ground sign, both non-illuminated and displaying static copy. The ground sign erected at the north frontage of the property, containing two sign faces. The wall sign erected on the entrance wall, located on the westerly elevation of the building. ****CANADIAN TIRE****

    Applied Sep 27, 2018 · issued Oct 18, 2018 · completed Mar 28, 2019 · Permit 18 233071 DST

    Closed
  • Heating and ventilation

    HVAC - Interior alterations of the existing business office area that pre-exist whitin a portion of a group F-2 warehouse facility which also has other group D business office areas eleswhere whith in it.

    Applied Jun 22, 2018 · issued Aug 7, 2018 · completed Dec 13, 2019 · Permit 18 183314 HVA

    Closed
  • Plumbing

    Plumbing - Interior alterations of the existing business office area that pre-exist whitin a portion of a group F-2 warehouse facility which also has other group D business office areas eleswhere whith in it.

    Applied Jun 22, 2018 · issued Aug 7, 2018 · completed Dec 13, 2019 · Permit 18 183314 PLB

    Closed
  • Addition or alteration · Interior alterations

    Interior alterations of the existing business office area that pre-exist whitin a portion of a group F-2 warehouse facility which also has other group D business office areas eleswhere whith in it. Canadian Tire

    Applied Jun 22, 2018 · issued Aug 7, 2018 · completed Nov 29, 2019 · Permit 18 183314 BLD

    Closed

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

None on file since 2017.

Everything planned in Don Valley East

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.