Toronto address · Ward 16, Don Valley East
75 Barber Greene Rd
The City of Toronto has 11 building permits since 2017 (4 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Inspections under way
Plumbing
Plumbing - Interior alteration to existing group d occupacy for Canadian Tire
Applied Jul 14, 2026 · issued Jul 16, 2026 · Permit 26 201604 PLB
- Permit issued
Heating and ventilation
HVAC - Interior alteration to existing group d occupacy for Canadian Tire
Applied Jul 14, 2026 · issued Jul 15, 2026 · Permit 26 201604 HVA
- Permit issued
Addition or alteration · Interior alterations
Interior alteration to existing group d occupacy for Canadian Tire
Applied Jul 14, 2026 · issued Jul 15, 2026 · Permit 26 201604 BLD
- Closed
Addition or alteration · Interior alterations
Proposed interior alterations to existing office space to add sprinklers and strobes for phone booths in open office areas.
Applied Oct 24, 2023 · issued Oct 30, 2023 · completed Mar 12, 2024 · Permit 23 218094 BLD
- Inspections under way
Fire and security upgrade · Electromagnetic locks
Proposal to install one electromagnetic lock.
Applied Nov 20, 2019 · issued Dec 23, 2019 · Permit 19 251449 FSU
- Closed
Addition or alteration · Interior alterations
Rev 01: Proposed revision to storage area as per bubbled drawingsInterior alterations of the existing business office area that pre-exist whitin a portion of a group F-2 warehouse facility which also has other group D business office areas eleswhere whith in it. Canadian Tire
Applied Jul 25, 2019 · issued Aug 15, 2019 · completed Nov 29, 2019 · Permit 18 183314 BLD (revision 01)
- Closed
Heating and ventilation
Rev 01: Proposed revision to storage area as per bubbled drawingsHVAC - Interior alterations of the existing business office area that pre-exist whitin a portion of a group F-2 warehouse facility which also has other group D business office areas eleswhere whith in it.
Applied Jul 25, 2019 · issued Aug 14, 2019 · completed Dec 13, 2019 · Permit 18 183314 HVA (revision 01)
- Closed
Designated structure · Sign building permit related
To erect and display one wall sign and one ground sign, both non-illuminated and displaying static copy. The ground sign erected at the north frontage of the property, containing two sign faces. The wall sign erected on the entrance wall, located on the westerly elevation of the building. ****CANADIAN TIRE****
Applied Sep 27, 2018 · issued Oct 18, 2018 · completed Mar 28, 2019 · Permit 18 233071 DST
- Closed
Heating and ventilation
HVAC - Interior alterations of the existing business office area that pre-exist whitin a portion of a group F-2 warehouse facility which also has other group D business office areas eleswhere whith in it.
Applied Jun 22, 2018 · issued Aug 7, 2018 · completed Dec 13, 2019 · Permit 18 183314 HVA
- Closed
Plumbing
Plumbing - Interior alterations of the existing business office area that pre-exist whitin a portion of a group F-2 warehouse facility which also has other group D business office areas eleswhere whith in it.
Applied Jun 22, 2018 · issued Aug 7, 2018 · completed Dec 13, 2019 · Permit 18 183314 PLB
- Closed
Addition or alteration · Interior alterations
Interior alterations of the existing business office area that pre-exist whitin a portion of a group F-2 warehouse facility which also has other group D business office areas eleswhere whith in it. Canadian Tire
Applied Jun 22, 2018 · issued Aug 7, 2018 · completed Nov 29, 2019 · Permit 18 183314 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
None on file since 2017.
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.