Toronto address · Ward 9, Davenport
75 Edwin Ave
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Garage
Construct a one car garage at rear of property
Applied Sep 8, 2025 · issued Sep 15, 2025 · completed Dec 19, 2025 · Permit 25 221762 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
1650-1664 Dupont Street and 3 Osler Street
6 storeys · 28 homes · Mixed use
160 m away · Site plan · Under review · filed Aug 16, 2021
- Under appeal
321-355 Symington Avenue and 350 Campbell Avenue
36 storeys · 873 homes · Residential
390 m away · Rezoning · Under appeal · filed Nov 24, 2022
- Approved
26 storeys · 314 homes · Residential
430 m away · Site plan · Approved · filed Apr 26, 2022
- Under appeal
- Under review
29 storeys · 288 homes · Mixed use
490 m away · Site plan · Under review · filed Jul 25, 2024
Neighbours’ Committee of Adjustment files within 250 m
2611 Dundas St W · Minor variance
To alter the existing one-storey detached building (Place of Worship) by converting this building into a three-storey apartment building with complete second and third storey additions, front (east) and side (north) basement level covered entrances, front (east) and rear (west) first level decks with stairs, and rear (west) third level terraces. Also, to construct a new one-storey ancillary building (containing five bicycle spaces and garbage collection) in the rear yard of the property. There will be a total of six residential dwelling units on this lot (two units occupying the basement leve…
210 m away · filed Dec 2, 2025 · Approved
96 Edwin Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a front second storey dormer, and a rear one-storey addition, a second storey addition with a deck, and a ground level deck.
50 m away · filed Mar 10, 2025 · Approved
2591 Dundas St W · Minor variance
To construct a new three-storey medical office building.
180 m away · filed Feb 7, 2025 · Application withdrawn
38 Hugo Ave · Minor variance
To construct a second storey on the existing rear ancillary building (detached garage) and convert it into a two-storey laneway suite. The existing parking spaces within the ground floor of the garage will be removed. The existing two-storey detached main dwelling on the lot will remain unaltered.
250 m away · filed Nov 15, 2023 · Withdrawn
1650 Dupont St · Minor variance
To construct a new six-storey mixed-use building containing 28 residential units and 2 ground floor commercial units (retail). The existing sporting club will be demolished.
150 m away · filed Jan 20, 2022 · Approved
1611 Dupont St · Minor variance
To convert the existing two-storey mixed-use building into an eating establishment on the ground and basement levels and office space on the second storey. Also, to construct a rear basement addition, a rear ground-level outdoor patio and a rear second-storey deck. The existing ground-level commercial unit and second-storey residential unit will be removed.
90 m away · filed Nov 22, 2021 · Approved
19 Edith Ave · Minor variance
To alter the existing two-storey townhouse by converting the attic into liveable space and constructing a third storey rear addition with a third storey rear deck.
210 m away · filed May 7, 2021 · Approved
102 Edwin Ave · Minor variance
To convert the existing two-unit two-storey semi-detached dwelling into a single-family dwelling by constructing a rear second storey addition and a rear ground floor deck.
70 m away · filed Mar 19, 2021 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.