Toronto address · Ward 19, Beaches-East York
75 Leuty Ave
The City of Toronto has 2 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing
Plumbing - Interior alterations to the exising second and third floor
Applied Apr 15, 2024 · issued Apr 23, 2024 · completed Mar 31, 2025 · Permit 24 136310 PLB
- Closed
Small residential project · Interior alterations
Interior alterations to the exising second and third floor
Applied Apr 15, 2024 · issued Apr 23, 2024 · completed Mar 31, 2025 · Permit 24 136310 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
30 Leuty Ave · Minor variance
To construct a new one-storey ancillary building (one-car detached garage and storage space) in the rear yard. The existing rear detached ancillary building (garage) will be demolished.
160 m away · filed Aug 31, 2026 · Hearing scheduled
11 Hambly Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear two-storey addition, which will be cantilevered on the rear (east) side of the dwelling.
230 m away · filed Aug 31, 2026 · Postponed
8 Douglas Browne Lane · Minor variance
To construct a new three-storey detached dwelling (fiveplex) with four covered south porch accesses with stairs (units A, B, C, and D) and one covered east porch access with stairs (unit E), four ground floor exterior garden courtyards (units A, C, D, and E), a south one-car integral garage (unit D), three second storey balconies (units A, C, and E), located on the southwest, south and northeast side of the building, as well as four third-storey balconies (units B, D, and E) located on the south, northeast, and north side of the building. This proposal has been reviewed as a building abutting…
240 m away · filed Nov 7, 2025 · Deferred
14 Hammersmith Ave · Minor variance
To maintain the existing two-storey semi-detached dwelling (fourplex). Also, the existing ancillary building (carport for two parking spaces) will be maintained and unaltered. The rear shed will be demolished.
220 m away · filed May 13, 2025 · Approved
16 Hammersmith Ave · Minor variance
To maintain the existing two-storey semi-detached dwelling (fourplex). Also, the existing ancillary building (carport for one parking space) will be maintained and unaltered. This carport is partially located on the south abutting lands (municipally known as 14 Hammersmith Avenue). The rear shed will be demolished.
210 m away · filed May 13, 2025 · Approved
14 Hammersmith Ave · Consent
To obtain consent to sever the property into two undersized residential lots and to establish/create new easements/rights-of-way.
220 m away · filed Apr 29, 2025 · Approved
24 Leuty Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear two-storey addition with a rear third storey deck above, a rear ground floor deck with stairs, and a rear basement walkout.
190 m away · filed Feb 12, 2025 · Approved
52 Scarboro Beach Blvd · Minor variance
To maintain the existing two-storey semi-detached dwelling (containing two residential dwelling units), with a front porch, and a front second storey balcony. Also, to maintain the rear one-storey ancillary building (three-car garage).
230 m away · filed Jan 23, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.