Toronto address · Ward 19, Beaches-East York
75 Peard Rd
The City of Toronto has 1 building permit since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Drains and site services · Back water valve (Sewer only)
Proposal to install a back water valve in existing SFD.
Applied Apr 3, 2017 · issued Apr 5, 2017 · completed Apr 11, 2017 · Permit 17 138296 DRN
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
77 Adair Rd · Minor variance
To legalize and to maintain the existing covered front porch with stairs that was built beyond the limits of the authorized building permit (Permit No. 21 177213 BLD 01 SR).
90 m away · filed May 4, 2026 · Approved
45 Peard Rd · Minor variance
To construct a new two-storey detached dwelling with an integral garage, a front covered porch with stairs, a rear covered ground floor deck with stairs, a rear basement walkout, a rear window well, and a rear second floor box bay window.
130 m away · filed Dec 8, 2025 · Approved
45 Peard Rd · Minor variance
To construct a new two-storey detached dwelling with an integral garage, a front covered porch with stairs, a rear covered ground floor deck with stairs, a rear basement walkout, a rear window well, and a rear second floor box bay window.
130 m away · filed Dec 8, 2025 · Approved
8 Holmstead Ave · Consent
To obtain consent to sever the property into two undersized residential lots and to maintain existing easements/rights-of-way.
230 m away · filed Jun 19, 2025 · Approved
8 Holmstead Ave · Minor variance
To construct a new two-storey detached dwelling (duplex) with a front porch with stairs, a front integral garage, a rear basement walkout, a rear first storey deck with stairs. There will be a total of two residential dwelling units on this lot.
230 m away · filed Feb 14, 2025 · Approved
8 Holmstead Ave · Minor variance
To construct a new two-storey detached dwelling (duplex) with a front porch with stairs, a front integral garage a rear basement walkout, and a rear first storey deck with stairs. There will be a total of two residential dwelling units on this lot.
230 m away · filed Feb 14, 2025 · Approved
2949 St Clair Ave E · Minor variance
To construct a new three-storey detached dwelling with an integrated garage and a rear second storey balcony.
250 m away · filed Jan 4, 2023 · Approved
83 Adair Rd · Minor variance
To construct a new three-storey detached dwelling with a front second storey porch and a rear second storey deck.
100 m away · filed Dec 28, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.