The City of Toronto has 10 building permits since 2017 (9 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - To demolish existing dwelling and construct a new three storey single family dwelling with finished basement

    Applied Jun 1, 2026 · issued Jun 16, 2026 · Permit 25 138753 HVA

    Permit issued
  • Alternative solution

    AS for application 25-138753 BLD 01 NH

    Applied Dec 8, 2025 · completed May 29, 2026 · Permit 25 263967 ALT

    Approved
  • New house · New building

    Revision 1: Adding a sub basement and revision to basement and first floor at rear and 2nd floor back and front portion.To demolish existing dwelling and construct a new three storey single family dwelling with finished basement

    Applied Aug 28, 2025 · issued Jul 7, 2026 · Permit 25 138753 BLD (revision 01)

    Revision issued
  • Small residential project · New laneway / rear yard suite

    Proposal to construct a new two storey laneway suite.

    Applied Aug 25, 2025 · issued Nov 7, 2025 · 1 home added · Permit 25 215565 BLD

    Inspections under way
  • Drains and site services

    Drain - Proposal to construct a new two storey garden suite.

    Applied Aug 25, 2025 · issued Nov 7, 2025 · Permit 25 215565 DRN

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct a new two storey garden suite.

    Applied Aug 25, 2025 · issued Nov 7, 2025 · Permit 25 215565 PLB

    Permit issued
  • Demolition

    To demolish existing dwelling and construct a new three storey dwelling with finished basement

    Applied Apr 3, 2025 · issued Apr 22, 2025 · completed Oct 7, 2025 · 1 home removed · Permit 25 138754 DEM

    Closed
  • Plumbing

    Plumbing - To demolish existing dwelling and construct a new three storey dwelling with finished basement

    Applied Apr 3, 2025 · issued Apr 22, 2025 · Permit 25 138753 PLB

    Inspections under way
  • Drains and site services

    Drain - To demolish existing dwelling and construct a new three storey dwelling with finished basement

    Applied Apr 3, 2025 · issued Apr 22, 2025 · Permit 25 138753 DRN

    Inspections under way
  • New house · New building

    To demolish existing dwelling and construct a new three storey single family dwelling with finished basement

    Applied Apr 3, 2025 · issued Apr 22, 2025 · 1 home added · Permit 25 138753 BLD

    Inspections under way

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · New R building

    To construct a new three-storey detached dwelling with front and rear ground floor covered porches and a rear third storey balcony.

    Decision: Approved (hearing Jan 29, 2025)

    Filed Dec 5, 2024 · File A1039/24TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 79 Roxborough St W · Minor variance

    To alter the existing three-storey detached dwelling by constructing a rear addition at the lower basement level, to connect and to provide access from the existing rear one-storey ancillary building (one-car garage) to the main dwelling.

    20 m away · filed Aug 5, 2026 · Hearing scheduled

  • 6 Gibson Ave · Minor variance

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a rear third storey addition with a balcony.

    230 m away · filed Jul 27, 2026 · Hearing scheduled

  • 89 Marlborough Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a complete third storey addition (cantilevered on the southeast side of the dwelling) with a rear covered balcony.

    200 m away · filed Mar 31, 2026 · Approved

  • 149 Marlborough Pl · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a third storey addition, and a rear ground floor deck with stairs. The existing rear two-storey addition will be demolished.

    250 m away · filed Dec 5, 2025 · Approved

  • 119 Macpherson Ave · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a two-storey rear addition with a ground floor deck with stairs, a rear third floor rooftop deck, and a new front porch with stairs.

    150 m away · filed Dec 4, 2025 · Approved

  • 37 Roxborough St W · Minor variance

    To legalize and maintain the existing rear basement walkout entrance, the rear ground floor deck with stairs, and the rear third storey roof deck, which were all constructed beyond the limits of an authorized building permit. There are a total of two residential dwelling units within the existing two-and-one-half-storey semi-detached dwelling on this lot.

    140 m away · filed Oct 23, 2025 · Approved

  • 92 Roxborough St W · Minor variance

    To construct a new three-storey detached dwelling with a front third storey balcony, a side (east) covered porch, and a rear in-ground swimming pool. Also, to construct a rear two-storey ancillary building (containing one laneway suite), which will comply with the regulations of the zoning by-law(s). There will be a total of two residential dwelling units on this lot instead of four residential units. One dwelling unit will occupy the main dwelling, and one unit will occupy the ancillary building.

    80 m away · filed Aug 27, 2025 · Approved

  • 77 Roxborough St W · Minor variance

    To construct a new three-storey detached dwelling with a front covered porch, a rear basement walkout with stairs, a rear third floor balcony, and an in-ground swimming pool. Also, to construct a new one-storey detached ancillary building (two-car garage) in the rear yard, abutting the laneway. The garage will be connected to the main dwelling underground (basement level).

    20 m away · filed Aug 21, 2025 · Approved

Everything planned in University-Rosedale

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.