Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

75 Willowbank Blvd

The City of Toronto has 4 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Heating and ventilation

    HVAC - Proposed basement underpinning 39m and interior alterations in all floors.

    Applied Mar 22, 2024 · issued Mar 28, 2024 · Permit 24 112183 HVA

    Inspections under way
  • Drains and site services

    Drain - Proposed basement underpinning 39m and interior alterations in all floors.

    Applied Feb 6, 2024 · issued Feb 15, 2024 · Permit 24 112183 DRN

    Inspections under way
  • Small residential project · Multiple projects

    Proposed basement underpinning 39m and interior alterations in all floors.

    Applied Feb 6, 2024 · issued Feb 13, 2024 · Permit 24 112183 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposed basement underpinning 39m and interior alterations in all floors.

    Applied Feb 6, 2024 · issued Feb 15, 2024 · Permit 24 112183 PLB

    Inspections under way

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 490 Eglinton Ave W · Minor variance

    Proposed change of use of the existing gymnasium to a retail store, together with interior alterations to combine with the existing retail space at 484 Eglinton Avenue West.

    250 m away · filed Jul 24, 2026 · Approved

  • 66 Burnaby Blvd · Minor variance

    To alter the existing detached dwelling by constructing a third storey addition and converting into an apartment building with 5 dwelling units.

    70 m away · filed May 5, 2026 · Approved

  • 453 Eglinton Ave W · Minor variance

    To alter the existing two-storey mixed-use building by converting a portion of the basement-level storage space into two hotel units by converting the ground-level garage into one hotel unit and adding six hotel units to the second level. Also, the remaining storage space/boiler room/walk-in freezer within the basement level, as well as the existing non-residential uses (restaurant and clothing store) on the ground level, will be maintained and unaltered.

    240 m away · filed Aug 6, 2025 · Deferred

  • 75 Elwood Blvd · Minor variance

    To construct a new dwelling.

    100 m away · filed Sep 26, 2023 · Approved

  • 416 Eglinton Ave W · Minor variance

    Proposal for a single storey open air roofed parking structure (carport) at the rear of the property

    150 m away · filed Jun 27, 2023 · Approved

  • 7 Shields Ave · Minor variance

    Proposal to modify existing driveway.

    180 m away · filed Feb 11, 2022 · Approved

  • 35 Willowbank Blvd · Minor variance

    Proposal to enclose existing porch and addition of new rear main floor deck.

    200 m away · filed Oct 3, 2021 · Approved

  • 300 Eglinton Ave W · Minor variance

    To construct a rear two-storey addition, a new third storey, and interior alterations. Once constructed, the ground floor will be occupied by an eating establishment, the second storey will be converted from one residential unit to office space, and the new third storey addition will include two new residential units.

    240 m away · filed Sep 14, 2021 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.