Toronto address · Ward 11, University-Rosedale
76 Asquith Ave
The City of Toronto has 2 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Deck
Proposal to construct a freestanding deck at the rear of an existing SFD-townhouse. See also 16 269355 ZZC and the TLAB Decision 17 181904.
Applied Mar 5, 2018 · issued Jun 5, 2018 · completed Sep 27, 2018 · Permit 18 124584 BLD
- Cancelled
Small residential project · Deck
To construct an addition to the existing rear deck
Applied Jun 29, 2016 · completed Nov 16, 2018 · Permit 16 182925 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To construct a new rear ground floor deck.
Decision: Refused (hearing May 30, 2017)
Filed Jan 25, 2017 · File A0086/17TEY
What’s planned nearby
Development sites within 500 m
- Under appeal
- Approved
85-97 Collier Street and 717 Church Street
300 homes · Residential
160 m away · Condominium · Approved · filed Sep 21, 2021
- Under review
- Under review
59 storeys · 656 homes · Mixed use
270 m away · Site plan · Under review · filed Apr 30, 2021
- Under review
11 storeys · 16 homes · Residential
310 m away · Site plan · Under review · filed Jul 5, 2024
- Under review
826-834 Yonge Street and 8 Cumberland Street
51 storeys · 399 homes · Mixed use
360 m away · Site plan · Under review · filed Jul 22, 2026
Neighbours’ Committee of Adjustment files within 250 m
235 Bloor St E · Minor variance
230 m away · filed Aug 31, 2026 · Postponed
820 Church St · Minor variance
To alter the development standards for a 38-storey hotel building (as approved under Site Specific Zoning By-law 300-2023) by increasing the non-residential gross floor area, building height, and mechanical penthouse height. The new 42-storey hotel building will have a total of 192 hotel rooms.
190 m away · filed Jul 9, 2024 · Approved
830 Church St · Minor variance
To construct a four-storey service building to support TTC Bloor-Yonge Station and the tunnel infrastructure.
200 m away · filed Mar 1, 2023 · Approved
137 Collier St · Minor variance
To alter the existing two-and-one-half-storey townhouse dwelling by enlarging the front third storey dormer and rear third storey terrace.
50 m away · filed May 16, 2022 · Approved
138 Rosedale Valley Rd · Minor variance
To alter the existing three-storey semi-detached dwelling by constructing a third-floor addition, and a rear third-floor enclosed balcony.
220 m away · filed Jan 20, 2021 · Approved
2 Bloor St E · Minor variance
To make multiple alterations to the hotel portion of the mixed-use building. A new restaurant/bar will be constructed on the podium roof along with a new elevator. Two pedestrian walkways connecting to the concourse, Yonge-Bloor subway station, and adjacent to the hotel vehicle pickup area will be enclosed.
240 m away · filed Mar 18, 2019 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.