Toronto address · Ward 6, York Centre
76 Clanton Park Rd
The City of Toronto has 6 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Multiple projects
Revision #01 - Changes to add to the second floor addition and construct a new bay window on the main floor.Proposed new interior alterations and addition to second floor. Changes to height
Applied Mar 4, 2020 · issued May 19, 2020 · completed Nov 17, 2020 · Permit 19 152260 BLD (revision 01)
- Closed
Plumbing
Plumbing - Proposed new interior alterations and addition to second floor.
Applied Dec 3, 2019 · issued Dec 3, 2019 · completed Nov 17, 2020 · Permit 19 152260 PLB
- Closed
Drains and site services
Drain - Proposed new interior alterations and addition to second floor.
Applied Dec 3, 2019 · issued Dec 9, 2019 · completed Nov 17, 2020 · Permit 19 152260 DRN
- Closed
Heating and ventilation
HVAC - Proposed new interior alterations and addition to second floor.
Applied Nov 7, 2019 · issued May 27, 2020 · completed Nov 17, 2020 · Permit 19 152260 HVA
- Closed
Small residential project · Multiple projects
Proposed new interior alterations and addition to second floor.
Applied May 10, 2019 · issued Jun 25, 2019 · completed Nov 17, 2020 · Permit 19 152260 BLD
- Closed
Small residential project · Interior alterations
Proposal to construct interior alterations to existing ground floor kitchen, including replacing a window opening with a new door out to the existing deck.
Applied Jul 30, 2018 · issued Aug 23, 2018 · completed Nov 17, 2020 · Permit 18 201557 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To permit the enlargement of a second storey addition to the existing dwelling in conjunction with other interior and exterior alterations.
Decision: Approved (hearing Jan 16, 2020)
Filed Nov 20, 2019 · File A0712/19NY
What’s planned nearby
Development sites within 500 m
No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.
Neighbours’ Committee of Adjustment files within 250 m
128 York Downs Dr · Minor variance
To alter the existing detached dwelling by constructing a second storey addition, an east side addition, a rear covered deck and a new front porch.
230 m away · filed Apr 27, 2026 · Approved
66 Palm Dr · Minor variance
To construct a second storey addition over the existing dwelling, in conjunction with other interior and exterior alterations.
160 m away · filed Mar 5, 2026 · Approved
17 Erica Ave · Minor variance
To construct a new dwelling.
180 m away · filed Dec 9, 2025 · Approved
64 Clanton Park Rd · Minor variance
Proposal to construct a new three-storey residential dwelling, and a cabana in the rear yard. (This application was previously deferred at the Committee of Adjustment hearing on November 21, 2024)
70 m away · filed Aug 15, 2024 · Approved
22 Erica Ave · Minor variance
Proposal to construct a second floor addition on an existing one-storey dwelling, a two-storey side addition, and a front porch extension.
170 m away · filed Aug 26, 2022 · Approved
111 Clanton Park Rd · Minor variance
Proposal to construct a 2-storey detached single family dwelling and cabana in the rear yard
190 m away · filed May 27, 2022 · Approved
72 Palm Dr · Minor variance
Proposal to construct a first floor addition, second floor addition, and rear yard covered deck.
180 m away · filed May 25, 2022 · Approved
22 Erica Ave · Minor variance
Proposal to construct a second floor addition, two storey side addition, and a front porch extension.
170 m away · filed May 16, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.