Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

77 Rankin Cres

The City of Toronto has 11 building permits since 2017 (4 still open) on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Garage Repair/Reconstruction

    Proposal for localized concrete repairs within the compactor room, installation of new waterproofing within the compactor room and localized masonry repairs within the compactor room.

    Applied Feb 11, 2026 · issued Mar 12, 2026 · Permit 26 115891 BLD

    Permit issued
  • Addition or alteration · Other

    Proposed structural changes to roof and replacment of four make-up air units on the roof of an existing apartment building.

    Applied Oct 6, 2020 · completed Oct 30, 2020 · Permit 20 203366 BLD

    Cancelled
  • Addition or alteration · Other

    Proposed waste collection rooms renovation:55 Rankin - Install Double door in an existing concrete block wall77 Rankin - Create tractor storage room & bulk waste area adjacent to parking stalls and renovate compactor room.

    Applied Jul 13, 2020 · issued Jul 22, 2020 · completed Dec 10, 2021 · Permit 20 166949 BLD

    Closed
  • Heating and ventilation · Special ventilation system

    Proposed replacement of (4) four make-up air units for an existing apartment building.

    Applied May 4, 2020 · issued May 28, 2020 · completed Mar 21, 2023 · Permit 20 142108 MSA

    Closed
  • Plumbing · Backflow prevention devices (Water only)

    Proposal to install backflow prevention device.

    Applied Nov 27, 2018 · issued Dec 19, 2018 · completed Sep 27, 2019 · Permit 18 261575 PSA

    Closed
  • Addition or alteration · Interior alterations

    Proposal for emergency repair due to vehicle impact on ground level - unit 111 - exterior and interior in existing apartment building.

    Applied Jul 25, 2018 · issued Aug 16, 2018 · completed Dec 12, 2018 · Permit 18 199765 BLD

    Closed
  • Heating and ventilation · Alter: Boiler/Furnace/AC replacement

    To replace existing boiler system(s).

    Applied May 19, 2015 · issued May 26, 2015 · completed Feb 16, 2017 · Permit 15 158760 MSA

    Closed
  • Heating and ventilation

    Nov 26/09: Revision to permit (See revision clouds)HVAC - Proposal to construct a roof over the entrance of an existing ramp leading to underground parking in an existing apartment building.

    Applied Nov 26, 2009 · issued Dec 11, 2009 · Permit 09 177228 HVA (revision 01)

    Revision issued
  • Fire and security upgrade

    FS - Sprinkler Shop Drawing - Proposal to construct a roof over the entrance of an existing ramp leading to underground parking in an existing apartment building.

    Applied Oct 28, 2009 · Permit 09 177228 FSU

    Application on hold
  • Plumbing

    Plumbing - Proposal to construct a roof over the entrance of an existing ramp leading to underground parking in an existing apartment building.

    Applied Oct 9, 2009 · issued Nov 20, 2009 · Permit 09 177228 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to construct a roof over the entrance of an existing ramp leading to underground parking in an existing apartment building.

    Applied Oct 8, 2009 · issued Nov 20, 2009 · completed Jun 8, 2026 · Permit 09 177228 HVA

    Closed (dormant)

Committee of Adjustment

No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 1319 Bloor St W · Consent

    To obtain consent to sever the property into two mixed-use lots and to create new easements/rights-of-way.

    190 m away · filed Sep 3, 2025 · Approved

  • 1319 Bloor St W · Minor variance

    To permit the construction of the Bloor Lansdowne SmartTrack GO Station, which consists of the main entrance building (municipally known as 1325 Bloor Street West), and a maintenance building with bicycle parking, and a partially enclosed waste and recycling storage area (municipally known as 17 Dora Avenue). The station also includes a West Access Building as well as other station elements (including the platforms, waiting enclosures, a pedestrian tunnel to access the westerly platform, stairs and elevators) will be located within the rail corridor and not part of the subject lands (municipa…

    190 m away · filed Apr 2, 2025 · Approved

  • 1319 Bloor St W · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 589-2022) for a 31-storey and 35-storey mixed-use building, by permitting an increase in building height and total gross floor area, and to modify the building envelope (setbacks and step-backs). There will be a total of 1,100 residential dwelling units on this lot.

    190 m away · filed Aug 16, 2024 · Approved

  • 105 Campbell Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear ground floor addition, rear and south side second storey additions, a complete third storey addition, a new rear basement walkout, and rear external stairs on all levels. There will be a total of three residential units in this dwelling.

    230 m away · filed Jan 17, 2024 · Refused

  • 104 Campbell Ave · Minor variance

    To legalize and to maintain the rear ground level addition (enclosed basement walkout entrance) and the above rear second floor walkout deck that were constructed without an authorized building permit.

    190 m away · filed Dec 12, 2023 · Approved

  • 1423 Bloor St W · Minor variance

    To alter the development standards (as approved under Site Specific Zoning By-law 927-2022 for an 18-storey mixed-use building with a 6-storey podium, and one level of underground parking) by constructing two additional storeys, increasing the overall building height and residential gross floor area.

    220 m away · filed Jul 5, 2023 · Approved

  • 105 Campbell Ave · Minor variance

    To convert the existing two-storey semi-detached dwelling from two dwelling units into three dwelling units by constructing a third storey addition and a rear three-storey addition. Also, to construct a new rear basement walkout, as well as a rear exterior three-storey staircase.

    230 m away · filed Jun 1, 2023 · Approved

  • 83 Campbell Ave · Minor variance

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, and a complete third storey addition. Also, to construct a rear one-storey ancillary building (office space).

    120 m away · filed Nov 3, 2022 · Approved

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.