Toronto address · Ward 19, Beaches-East York
78 Coleridge Ave
The City of Toronto has 3 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal for basement interior alterations to existing sfd-semi.
Applied Jul 12, 2017 · issued Jul 19, 2017 · completed Sep 28, 2017 · Permit 17 169078 HVA
- Closed
Plumbing
Plumbing - Proposal for basement interior alterations to existing sfd-semi.
Applied May 30, 2017 · issued May 31, 2017 · completed Sep 28, 2017 · Permit 17 169078 PLB
- Closed
Small residential project · Interior alterations
Proposal for basement interior alterations to existing sfd-semi.
Applied May 30, 2017 · issued May 31, 2017 · completed Sep 28, 2017 · Permit 17 169078 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Approved
- Under review
2078-2106 Danforth Avenue and 985 Woodbine Avenue
35 storeys · 601 homes · Mixed use
410 m away · Site plan · Under review · filed Dec 18, 2024
Neighbours’ Committee of Adjustment files within 250 m
1095 Woodbine Ave · Minor variance
To legalize and maintain the existing enclosed front porch (for habitable space), which was constructed without an authorized building permit, on the existing two-storey semi-detached dwelling.
50 m away · filed Dec 22, 2025 · Deferred
127 Coleridge Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition. The existing rear ground floor deck will be demolished.
100 m away · filed Nov 24, 2025 · Approved
322 Queensdale Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a new front covered porch with a basement walkout, and a rear two-storey addition.
220 m away · filed May 22, 2025 · Approved
33 Coleridge Ave · Minor variance
To construct a new three-storey detached dwelling with an integral garage, a front covered porch with stairs, and a rear second floor deck with stairs.
220 m away · filed Feb 21, 2025 · Approved
838 Sammon Ave · Minor variance
To legalize and to maintain the rear basement walkout, which was constructed without an authorized building permit. Also, the rear yard parking pad was removed.
240 m away · filed Mar 1, 2024 · Approved
834 Sammon Ave · Minor variance
To convert the existing one-and-one-half-storey detached dwelling from one dwelling unit into two dwelling units, by installing an additional unit within the basement. Also, to demolish the existing one-storey rear portion, and to construct a complete second storey addition, a two-storey rear addition (with basement), a ground floor front covered porch with stairs, a ground floor rear deck with stairs, as well as side (east) access stairs.
250 m away · filed Nov 22, 2023 · Approved
101 King Edward Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear two storey addition, a rear ground floor deck with stairs, a rear basement walkout and a roof top deck with an access stair enclosure. Also, to enclose the existing front porch.
240 m away · filed Oct 18, 2023 · Approved
189 Cedarvale Ave · Minor variance
To alter the existing six-storey apartment building by converting an existing laundry room and an existing lounge on the first floor into two additional dwelling units. Also, to construct long-term bicycle parking spaces outside the front of the building.
150 m away · filed Sep 20, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.