Toronto address · Ward 14, Toronto-Danforth
78 Eaton Ave
The City of Toronto has 7 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Multiple projects
Revision - interior alteration to the second floor washrooms and existing window locations. Reconstruct front porch to within the same limits, and reconstruct rear ground floor deck.Interior alterations throughout dwelling, convert area of basement crawl space to living area, basement underpinning, create third floor bedroom, front and rear balcony, rear deck and side walkout stair.
Applied May 10, 2022 · issued May 17, 2022 · completed Feb 13, 2023 · Permit 21 242569 BLD (revision 01)
- Closed
Heating and ventilation
HVAC - Interior alterations throughout dwelling, convert area of basement crawl space to living area, basement underpinning, create third floor bedroom, front and rear balcony, rear deck
Applied Dec 4, 2021 · issued Jan 21, 2022 · completed Feb 13, 2023 · Permit 21 242569 HVA
- Closed
Plumbing
Plumbing - Interior alterations throughout dwelling, convert area of basement crawl space to living area, basement underpinning, create third floor bedroom, front and rear balcony, rear deck
Applied Dec 3, 2021 · issued Jan 21, 2022 · completed Feb 13, 2023 · Permit 21 242569 PLB
- Closed
Drains and site services
Drain - Interior alterations throughout dwelling, convert area of basement crawl space to living area, basement underpinning, create third floor bedroom, front and rear balcony, rear deck
Applied Dec 3, 2021 · issued Jan 21, 2022 · completed Oct 24, 2022 · Permit 21 242569 DRN
- Closed
Small residential project · Multiple projects
Interior alterations throughout dwelling, convert area of basement crawl space to living area, basement underpinning, create third floor bedroom, front and rear balcony, rear deck and side walkout stair.
Applied Nov 28, 2021 · issued Jan 21, 2022 · completed Feb 13, 2023 · Permit 21 242569 BLD
- Cancelled
Plumbing · Piping: SFD/Semi
PROPOSED: Plumbing Stand-alone Redo the basement drains
Applied Oct 19, 2021 · completed Dec 3, 2021 · Permit 21 227811 PSA
- Closed
Drains and site services · Inside and outside drains
PROPOSED: Plumbing Stand-alone Redo the basement drains
Applied Oct 12, 2021 · issued Oct 20, 2021 · completed Feb 13, 2023 · Permit 21 224788 STS
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
49 storeys · 496 homes · Mixed use
290 m away · Site plan · Under review · filed Aug 3, 2022
Neighbours’ Committee of Adjustment files within 250 m
88 Woodycrest Ave · Minor variance
To construct a new one-storey detached ancillary building (shed) in the rear yard. The existing rear one-storey detached ancillary building (shed) will be demolished.
160 m away · filed Aug 11, 2026 · Hearing scheduled
108 Eaton Ave · Minor variance
Proposal to construct a ground floor 1-storey rear addition & a ground floor rear yard deck for this existing detached SFD. Scope includes the demolition of the exist. rear addition & the exist. rear yard deck.
110 m away · filed Jun 2, 2026 · Accepted
96 Woodycrest Ave · Minor variance
To alter the existing three-storey detached dwelling (currently under construction from the original building permit (No. 25 250398 BLD 00 SR)) by constructing a new front porch with a canopy and stairs.
180 m away · filed May 8, 2026 · Approved
38 Woodycrest Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition with rear ground floor deck with stairs and reconstructing front ground floor porch with stairs. Also, to construct a new one-storey detached ancillary building (two-car garage) in the rear yard, abutting the laneway.
120 m away · filed Mar 19, 2026 · Approved
43 Eaton Ave · Minor variance
To construct a new three-storey detached building (houseplex) with front and rear basement walkouts, first storey front and rear covered porches, and front and rear second storey decks. Also, to construct a new rear two-storey ancillary building (containing one laneway suite), abutting the laneway. There will be a total of five residential dwelling units on this lot (four units occupying the main building, and one unit occupying the ancillary building).
120 m away · filed Mar 12, 2026 · Deferred
49 Muriel Ave · Minor variance
To construct a new front yard parking pad, abutting Muriel Avenue.
90 m away · filed Oct 10, 2025 · Refused
111 Gough Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (with basement below), a third storey addition, a side (south) basement walkout, a rear ground floor covered deck with stairs, and front and rear third storey balconies There will be a total of two dwelling units on the lot (one secondary suite in the basement).
240 m away · filed Jul 25, 2025 · Deferred
53 Woodycrest Ave · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a front one-storey addition with a covered porch, front partial second and third storey additions, a rear basement walkout, and a rear three-storey addition with decks on the first, second, and third levels. Also, to construct a new parking pad in the rear yard of the property, abutting the laneway. The existing rear ancillary building (detached garage) will be demolished. There will be a total of three residential dwelling units on this lot (Unit 1 will occupy the basement and first level, Unit 2 will occupy…
150 m away · filed Apr 30, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.