Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 9, Davenport

78 Miller St

The City of Toronto has 6 building permits since 2017 (6 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Addition or alteration · Addition(s)

    Rev 1:Proposed 3 storey read addition - Motor vehicle repair shop - Class B with accessory offices.<<Proposal to construct a two storey rear addition to existing one storey building (Motor vehicle repair shop - Class B). See also 15 202608 ZZC and 16 143544 MV.>>

    Applied Jan 28, 2022 · issued Jan 14, 2025 · Permit 16 208028 BLD (revision 01)

    Revision issued
  • Plumbing

    Revision #01 - Proposal for a (3) storey rear addition, include a mezzanine, and roof deck.Plumbing - Proposal to construct a two storey rear addition to existing one storey industrial building. See also 15 202608 ZZC and 16 143544 MV.

    Applied Jan 15, 2020 · issued Feb 18, 2020 · Permit 16 208028 PLB (revision 01)

    Revision issued
  • Heating and ventilation

    Revision #01 - Proposal for a (3) storey rear addition, include a mezzanine, and roof decks.HVAC - Proposal to construct a two storey rear addition to existing one storey industrial building. See also 15 202608 ZZC and 16 143544 MV.

    Applied Jan 15, 2020 · Permit 16 208028 HVA (revision 01)

    Examiner's notice sent
  • Addition or alteration · Addition(s)

    Proposal to construct a two storey rear addition to existing one storey industrial building. See also 15 202608 ZZC and 16 143544 MV.

    Applied Aug 16, 2016 · issued Mar 1, 2018 · Permit 16 208028 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct a two storey rear addition to existing one storey industrial building. See also 15 202608 ZZC and 16 143544 MV.

    Applied Aug 16, 2016 · issued Mar 1, 2018 · Permit 16 208028 PLB

    Inspections under way
  • Heating and ventilation

    HVAC - Proposal to construct a two storey rear addition to existing one storey industrial building. See also 15 202608 ZZC and 16 143544 MV.

    Applied Aug 16, 2016 · issued Mar 1, 2018 · Permit 16 208028 HVA

    Permit issued

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · Other

    To alter the existing lawful non-conforming Class B Motor Vehicle Repair Shop by constructing a rear three-storey addition with a rear second storey deck, and a front third storey deck.

    Decision: Approved (hearing Dec 8, 2021)

    Filed Mar 26, 2021 · File A0925/21TEY

    Closed

What’s planned nearby

Development sites within 500 m

Neighbours’ Committee of Adjustment files within 250 m

  • 61 Pelham Park Gdns · Minor variance

    To alter the existing 17-storey residential apartment building by replacing the existing entrance vestibule with a larger reconstructed resident lobby and mail room.

    220 m away · filed Sep 11, 2025 · Approved

  • 257 Osler St · Minor variance

    To legalize and to maintain the existing two-storey detached ancillary building (two-car garage), in the rear yard.

    190 m away · filed Feb 20, 2024 · Approved

  • 136 Osler St · Minor variance

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a new rear one-storey addition.

    230 m away · filed Mar 16, 2022 · Approved

  • 46 Lindner St · Minor variance

    To alter the existing two-storey semi-detached dwelling, containing two dwelling units, by constructing an additional dwelling unit on the ground floor, for a total of three dwelling units.

    90 m away · filed May 14, 2021 · Approved

  • 44 Lindner St · Minor variance

    To alter the existing two-storey semi-detached dwelling, containing two dwelling units, by constructing an additional dwelling unit on the ground floor, for a total of three dwelling units.

    80 m away · filed May 14, 2021 · Approved

  • 25 Miller St · Minor variance

    To create an additional secondary suite. The dwelling will contain one dwelling unit and two secondary suites.

    150 m away · filed Nov 20, 2018 · Refused

  • 2036 Davenport Rd · Minor variance

    To alter the existing triplex building by: constructing a third storey (cantilevered) addition above the existing building, which will contain a fourth dwelling unit and constructing a roof top patio above the proposed addition and a patio above the existing garage.

    170 m away · filed Aug 16, 2017 · Approved

  • 2016 Davenport Rd · Minor variance

    To construct a second storey addition above the existing rear attached garage and to construct a second suite.

    210 m away · filed May 16, 2016 · Deferred aug 18, 2016 (Orig mark Kehler)

Everything planned in Davenport

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.