Toronto address · Ward 14, Toronto-Danforth
789 Pape Ave
The City of Toronto has 6 building permits since 2017 (1 still open) and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Small residential project · Change of use
REV 01 - Scope of Work: Review is limited to the area(s) bubbled [interior layout changes as noted and the conversion of the 2nd floor enclosed balcony into interior space]. No other work or approval beyond the bubbled area(s). Structures and Uses identified as existing conditions on this building have not been reviewed for compliance with the OBC, nor have they been verified or approved. The performance level of the building after the material alteration or repair shall be at least equal to the performance level of the building prior to the material alteration or repair and shall not create…
Applied Sep 12, 2023 · issued Oct 4, 2023 · completed Feb 21, 2024 · Permit 21 163945 BLD (revision 01)
- Closed
Plumbing
Plumbing - Proposal to convert the residential/commerical unit to a 2+Unit Detached Dwelling
Applied Aug 24, 2023 · issued Sep 25, 2023 · completed Feb 21, 2024 · Permit 21 163945 PLB
- Closed
Heating and ventilation
HVAC - Proposal to convert the residential/commerical unit to a 2+Unit Detached Dwelling.Changing current forced air supply to radian heat, and AC will also change to ductless splits.
Applied Jun 16, 2023 · issued Jun 29, 2023 · completed Feb 21, 2024 · Permit 21 163945 HVA
- Closed
Small residential project · Multiple projects
Proposal to construct front yard basement walkout and modify enclosed front porch to accommodate new walkout
Applied Dec 6, 2021 · issued Dec 29, 2021 · completed Aug 31, 2023 · Permit 21 245275 BLD
- Closed
Small residential project · Change of use
Proposal to convert the residential/commerical unit to a 2+Unit Detached Dwelling
Applied Jun 1, 2021 · issued Aug 4, 2021 · completed Feb 21, 2024 · 1 home added · Permit 21 163945 BLD
- Inspections under way
Plumbing · Backflow prevention devices (Water only)
1 Back flow prevention device.
Applied Jun 3, 2009 · issued Jul 24, 2009 · Permit 09 145326 PSA
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · Other
To convert the existing one-unit, two-storey detached dwelling into a two-unit, two-storey detached dwelling by constructing a front basement walkout.
Decision: Approved (hearing Sep 29, 2021)
Filed Jun 2, 2021 · File A0743/21TEY
What’s planned nearby
Development sites within 500 m
- Under review
49 storeys · 496 homes · Mixed use
270 m away · Site plan · Under review · filed Aug 3, 2022
Neighbours’ Committee of Adjustment files within 250 m
88 Woodycrest Ave · Minor variance
To construct a new one-storey detached ancillary building (shed) in the rear yard. The existing rear one-storey detached ancillary building (shed) will be demolished.
240 m away · filed Aug 11, 2026 · Hearing scheduled
108 Eaton Ave · Minor variance
Proposal to construct a ground floor 1-storey rear addition & a ground floor rear yard deck for this existing detached SFD. Scope includes the demolition of the exist. rear addition & the exist. rear yard deck.
150 m away · filed Jun 2, 2026 · Accepted
38 Woodycrest Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear two-storey addition with rear ground floor deck with stairs and reconstructing front ground floor porch with stairs. Also, to construct a new one-storey detached ancillary building (two-car garage) in the rear yard, abutting the laneway.
230 m away · filed Mar 19, 2026 · Approved
43 Eaton Ave · Minor variance
To construct a new three-storey detached building (houseplex) with front and rear basement walkouts, first storey front and rear covered porches, and front and rear second storey decks. Also, to construct a new rear two-storey ancillary building (containing one laneway suite), abutting the laneway. There will be a total of five residential dwelling units on this lot (four units occupying the main building, and one unit occupying the ancillary building).
190 m away · filed Mar 12, 2026 · Deferred
49 Muriel Ave · Minor variance
To construct a new front yard parking pad, abutting Muriel Avenue.
90 m away · filed Oct 10, 2025 · Refused
111 Gough Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (with basement below), a third storey addition, a side (south) basement walkout, a rear ground floor covered deck with stairs, and front and rear third storey balconies There will be a total of two dwelling units on the lot (one secondary suite in the basement).
140 m away · filed Jul 25, 2025 · Deferred
13 Cruikshank Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing an east side three-storey addition, a front covered porch, and a rear deck with stairs. Also, to permit a front yard parking pad and to construct a rear one-storey ancillary building (shed). The existing rear one-storey ancillary building (three-car garage) will be demolished.
180 m away · filed Mar 10, 2025 · Approved
58 Woodycrest Ave · Minor variance
To alter the exiting two-storey detached dwelling by constructing a third storey dormer addition with rear deck (on the roof of the second storey below), a front and rear one-storey addition, and a partial side (south) and rear two-storey addition. The existing ancillary building (detached garage) will be maintained and unaltered.
210 m away · filed Sep 9, 2024 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.