Sample data. These listings are fictional examples used to demonstrate the site. No MLS or board data is displayed.

Shaun Lovell, Real Estate SalespersonRight At Home Realty, Brokerage289-813-3318

Toronto address · Ward 8, Eglinton-Lawrence

79 Regina Ave

The City of Toronto has 5 building permits since 2017 (5 still open) and 1 Committee of Adjustment file on record for this address.

Building permits

Every permit the City lists for this address since 2017, and any still open from before, newest first.

  • Small residential project · Second suite (New)

    REVISION - to legalize the 2nd suite in the basementProposal to construct one storey rear addition and interior alterations to existing sfd.

    Applied Oct 3, 2018 · issued Oct 18, 2018 · Permit 18 208049 BLD (revision 01)

    Revision issued
  • Heating and ventilation

    HVAC - Proposal to construct one storey rear addition and interior alterations to exisiting sfd.

    Applied Aug 30, 2018 · issued Sep 18, 2018 · Permit 18 208049 HVA

    Inspections under way
  • Small residential project · Multiple projects

    Proposal to construct one storey rear addition and interior alterations to exisiting sfd.

    Applied Aug 13, 2018 · issued Sep 10, 2018 · Permit 18 208049 BLD

    Inspections under way
  • Plumbing

    Plumbing - Proposal to construct one storey rear addition and interior alterations to exisiting sfd.

    Applied Aug 13, 2018 · issued Sep 10, 2018 · Permit 18 208049 PLB

    Inspections under way
  • Drains and site services

    Drain - Proposal to construct one storey rear addition and interior alterations to exisiting sfd.

    Applied Aug 13, 2018 · issued Sep 10, 2018 · Permit 18 208049 DRN

    Work not started

Committee of Adjustment

This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.

  • Minor variance · R addition

    To alter the existing one-storey dwelling by constructing a one-storey rear addition.

    Decision: Approved (hearing Jul 12, 2018)

    Filed Jun 1, 2018 · File A0418/18NY

    Closed

What’s planned nearby

Development sites within 500 m

No rezoning, site plan, subdivision or condominium file open within 500 m, and no pre-construction project on the site.

Neighbours’ Committee of Adjustment files within 250 m

  • 113 Brookview Dr · Minor variance

    To construct a new two-storey detached dwelling.

    250 m away · filed Jun 29, 2026 · Approved on condition

  • 64 Ridgevale Dr · Minor variance

    To construct a new detached dwelling with a rear deck and walk-out.

    170 m away · filed Apr 20, 2026 · conditional approval

  • 57 Sultana Ave · Minor variance

    To legalize and maintain the habitable space in the converted integral garage and to permit a wood deck.

    170 m away · filed Aug 5, 2025 · Approved

  • 105 Regina Ave · Minor variance

    Proposal to construct a new dwelling.

    160 m away · filed Mar 21, 2025 · Approved

  • 80 Sultana Ave · Minor variance

    To construct a new fourplex dwelling. Note: This application was previously deferred at the Committee of Adjustment hearing on May 1, 2025.

    150 m away · filed Mar 4, 2025 · Approved

  • 76 Ridgevale Dr · Minor variance

    Proposal to construct a new two storey single family dwelling with a front porch, rear balcony, walkout and deck. This application was previously deferred to make revisions to plans.

    220 m away · filed Apr 6, 2023 · Approved

  • 75 Baycrest Ave · Minor variance

    Proposal to construct a new dwelling.

    200 m away · filed Oct 6, 2022 · Approved

  • 56 Regina Ave · Minor variance

    Proposal to demolish existing dwelling and to construct a new 3 storey single family dwelling.

    160 m away · filed Feb 28, 2022 · Approved

Everything planned in Eglinton-Lawrence

From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.