Toronto address · Ward 11, University-Rosedale
792 Markham St
The City of Toronto has 3 building permits since 2017 and 1 Committee of Adjustment file on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Heating and ventilation
HVAC - Proposal to construct third floor addition, new ground floor deck at rear, new second floor deck at rear, and interior alterations to ground and second floor.
Applied Oct 1, 2019 · issued Oct 17, 2019 · completed Aug 10, 2020 · Permit 19 229996 HVA
- Closed
Plumbing
Plumbing - Proposal to construct third floor addition, new ground floor deck at rear, new second floor deck at rear, and interior alterations to ground and second floor.
Applied Oct 1, 2019 · issued Oct 15, 2019 · completed Aug 10, 2020 · Permit 19 229996 PLB
- Closed
Small residential project · Multiple projects
Proposal to construct a 2nd storey rear addition, new ground floor deck at rear and interior alterations to 1st and 2nd floors of the existing 2 Unit Dwelling.
Applied Oct 1, 2019 · issued Oct 15, 2019 · completed Aug 18, 2020 · Permit 19 229996 BLD
Committee of Adjustment
This address's applications to the City's Committee of Adjustment since 2017, and any still open. A minor variance asks for a small exception to the zoning by-law, such as a little more height or a smaller setback; a consent divides a lot or grants an easement.
- Closed
Minor variance · R addition
To alter the existing 2½-storey semi-detached dwelling by constructing front and rear third storey additions, and rear first and second storey decks.
Decision: Approved (hearing Jan 23, 2019)
Filed Aug 15, 2018 · File A0796/18TEY
What’s planned nearby
Development sites within 500 m
- Approved
Neighbours’ Committee of Adjustment files within 250 m
80 Barton Ave · Minor variance
To permit an existing ground floor eating establishment (coffee shop with indoor seating, and retail store), and an existing ground floor instructional artist studio (including a retail store), to operate within the three-storey mixed-use building. There are two residential dwelling units (occupying the second and third levels).
240 m away · filed Sep 3, 2026 · Hearing scheduled
918 Bathurst St · Minor variance
To permit the existing entertainment place of assembly (arts and cultural events) use within the existing one-storey non-residential building.
120 m away · filed Jul 28, 2026 · Hearing scheduled
735 Markham St · Minor variance
To alter the existing three-storey townhouse dwelling by constructing a rear third storey addition above the rear two-storey portion of the dwelling.
180 m away · filed Jun 30, 2026 · Approved
774 Markham St · Minor variance
To alter the existing three-storey semi-detached dwelling by enclosing the rear third storey balcony into habitable space.
40 m away · filed Jun 15, 2026 · Approved
60 Olive Ave · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a rear one-storey addition with stairs. The existing rear ground level deck will be demolished.
190 m away · filed May 20, 2026 · Approved
750 Markham St · Minor variance
To legalize and to maintain the rear third storey deck enclosure addition (sunroom), which was constructed without an authorized building permit.
100 m away · filed Apr 22, 2026 · Approved
55 Palmerston Sq · Minor variance
To construct a new three-storey detached dwelling with front (east) cantilevered second and third storeys as well as front (east) and rear (west) third storey dormers, a covered front porch with stairs, a front basement walkout with stairs and a rear ground floor deck with stairs.
250 m away · filed Sep 26, 2025 · Approved
786 Markham St · Minor variance
To alter the existing two-and-one-half-storey semi-detached dwelling by construct a front third storey dormer addition with a balcony.
20 m away · filed Jun 27, 2025 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.