Toronto address · Ward 14, Toronto-Danforth
792 Pape Ave
The City of Toronto has 3 building permits since 2017 (2 still open) on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Cancelled
Small residential project · Addition(s)
Proposal to enclose the front porch of an existing SFD-semi dwelling.See also 17 223719 WNP
Applied Sep 13, 2017 · completed Jul 17, 2018 · Permit 17 232188 BLD
- Inspections under way
Small residential project · Porch
alter plan BP 03-153318 BLD by altering original basement walkout design (Reconstruct front porch and cold room with basement walkout at front of existing single family semi-detached dwelling building)
Applied Jul 25, 2003 · issued Sep 24, 2003 · Permit 03 153318 BLD (revision 01)
- Inspections under way
Small residential project · Porch
Reconstruct front porch and cold room with basement walkout at front of existing single family semi-detached dwelling building
Applied Jul 8, 2003 · issued Jul 8, 2003 · Permit 03 153318 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under review
49 storeys · 496 homes · Mixed use
320 m away · Site plan · Under review · filed Aug 3, 2022
Neighbours’ Committee of Adjustment files within 250 m
108 Eaton Ave · Minor variance
Proposal to construct a ground floor 1-storey rear addition & a ground floor rear yard deck for this existing detached SFD. Scope includes the demolition of the exist. rear addition & the exist. rear yard deck.
150 m away · filed Jun 2, 2026 · Accepted
49 Muriel Ave · Minor variance
To construct a new front yard parking pad, abutting Muriel Avenue.
100 m away · filed Oct 10, 2025 · Refused
111 Gough Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear two-storey addition (with basement below), a third storey addition, a side (south) basement walkout, a rear ground floor covered deck with stairs, and front and rear third storey balconies There will be a total of two dwelling units on the lot (one secondary suite in the basement).
170 m away · filed Jul 25, 2025 · Deferred
13 Cruikshank Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing an east side three-storey addition, a front covered porch, and a rear deck with stairs. Also, to permit a front yard parking pad and to construct a rear one-storey ancillary building (shed). The existing rear one-storey ancillary building (three-car garage) will be demolished.
180 m away · filed Mar 10, 2025 · Approved
234 Browning Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a partial front one-storey addition (solarium). Also, to construct a one-storey ancillary building (detached garage), in the front yard.
190 m away · filed Jul 24, 2024 · Approved
878 Carlaw Ave · Consent
Section 57(1) of the Planning Act allows the assignment of authority to the Secretary-Treasurer, Committee of Adjustment or his/her designate to approve a Validation of Title.
210 m away · filed Jun 12, 2024 · Approved
114 Eaton Ave · Minor variance
To alter the existing one-storey detached dwelling by constructing a complete second storey addition, a rear two-storey addition, a side (south) two-storey addition, an integral garage, a front porch with stairs, a rear ground floor deck with stairs, a front second storey balcony, and a rear basement walkout. Also, to construct interior alterations to convert the dwelling into a duplex. There will be two residential dwelling units within this altered dwelling.
160 m away · filed May 17, 2024 · Approved
889 Carlaw Ave · Minor variance
To alter the existing two-storey detached dwelling by constructing a complete third storey addition with a rear balcony.
170 m away · filed Dec 13, 2023 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.