Toronto address · Ward 11, University-Rosedale
797 College St
The City of Toronto has 2 building permits since 2017 on record for this address.
Building permits
Every permit the City lists for this address since 2017, and any still open from before, newest first.
- Closed
Plumbing · Backflow prevention devices (Water only)
Proposal to install a 3/4 inch backflow prevention device.
Applied Aug 10, 2017 · issued Aug 24, 2017 · completed Sep 27, 2017 · Permit 17 214306 PSA
- Closed (dormant)
Addition or alteration · Interior alterations
Proposal for the erection of a new stud wall located at the West side of 797 College Street. See folder no. 08 110 942 BLD.
Applied Mar 25, 2009 · issued Oct 13, 2009 · completed Jun 8, 2026 · Permit 09 120139 BLD
Committee of Adjustment
No applications to the City's Committee of Adjustment for this address since 2017. That's where an owner asks for a minor variance (a small exception to the zoning by-law) or a consent to divide a lot.
What’s planned nearby
Development sites within 500 m
- Under appeal
- Under review
Neighbours’ Committee of Adjustment files within 250 m
409 Ossington Ave · Consent
To obtain consent for the technical severance of the property for the purpose of re-establishing two residential lots which merged on title.
160 m away · filed Feb 5, 2026 · Approved
186 Roxton Rd · Minor variance
To alter the existing two-storey semi-detached dwelling by constructing a side (south) one-storey addition, a rear two-storey addition (above with a portion of the existing one-storey), and a partial third storey addition (dormer) with a rear (west) deck. Also, to alter the existing one-storey ancillary building (detached garage in the rear yard, abutting the lane) by reducing a front (east) portion of the building (storage shed), and to construct a front (east) canopy structure (awning).
110 m away · filed Dec 4, 2025 · Approved
12 Sully Cres · Minor variance
To construct a new three-storey detached residential building (houseplex) with a front covered porch with stairs and a platform lift (elevating device), front and side (west) box bay windows, rear covered balconies on the first, second, and third levels with exterior access stairs (fire escape), and front and rear basement walkouts. There will be a total of six residential dwelling units on this lot.
170 m away · filed Sep 12, 2025 · Deferred
260 Roxton Rd · Minor variance
To alter the existing two-storey townhouse dwelling by constructing rear one and two-storey additions, a rear second floor deck (above the new rear one-storey addition), and a rear ground floor deck. The existing rear one-storey addition, and rear ground floor deck will be demolished.
140 m away · filed May 9, 2025 · Approved
475 Ossington Ave · Minor variance
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear second storey addition with a rear third storey rooftop deck. There will be three residential dwelling units within this dwelling.
180 m away · filed Nov 21, 2023 · Approved
382 Crawford St · Minor variance
To alter the existing two-storey detached dwelling by constructing a rear one-storey addition and a new rear deck with staris.
210 m away · filed Mar 16, 2023 · Approved
209 Montrose Ave · Minor variance
To construct a new one-storey ancillary building (two-car garage) in the rear yard of the property, abutting the laneway.
250 m away · filed Dec 22, 2022 · Approved
178 Roxton Rd · Minor variance
To convert the existing three-storey semi-detached dwelling from one-unit into two-units by installing one secondary suite within the basement. Also, to construct a rear second and third storey addition, a ground floor covered front porch, second storey front balcony, third storey rear balcony, and front and rear basement walkouts. In addition, to construct a new one-storey ancillary building (detached garage) in the rear yard, abutting the laneway.
130 m away · filed Nov 30, 2022 · Approved
From the City of Toronto’s open data: building permits (active, and cleared since 2017), Committee of Adjustment applications and address points, this record updated Sep 29, 2026, and the development sites from its Development Applications data. Contains information licensed under the Open Government Licence – Toronto. Construction cost estimates and contractors’ names are left out on purpose, and nothing here names an owner.